Alternative materials to steel reinforcement in concrete

Closes in 18 daysSubmission deadline: 09 December 2026, 03:00 PM Australia/Sydney

About this tender

Overview Austroads Ltd is seeking a contractor to evaluate the feasibility, performance and sustainability benefits of alternative reinforcement materials to steel in concrete applications used across transport infrastructure in Australia and New Zealand. Purpose The purpose of this project is to evaluate the feasibility, performance and sustainability benefits of alternative reinforcement materials, such as polymer based and basalt fibre reinforcements, in concrete applications across Australia and New Zealand. Australian and New Zealand transport agencies are seeking opportunities to reduce the environmental impacts of infrastructure through use of more sustainable materials while maintaining technical performance, durability and safety. Alternative reinforcement materials may support sustainability outcomes through lower embodied carbon, increased material circularity, reduced weight, improved corrosion resistance, longer asset life and end-of-life options. However, transport agencies face barriers to adopting new and innovative materials including limited awareness of available alternatives and their applications, entrenched practices, prescriptive standards and specifications, limited material availability and varying levels of industry readiness. This project will establish evidence for practical application of alternative concrete reinforcement materials by the transport sector, supporting efforts to reduce embodied carbon and improve asset performance. The focus is on alternatives to conventional steel reinforcement because steel production can make a material contribution to the embodied carbon of reinforced-concrete infrastructure. Scope The scope includes: Undertaking a comprehensive review of existing evidence and relevant local and international case studies on alternative reinforcement materials and their use in transport infrastructure, including polymer-based, basalt-fibre and glass-fibre reinforcement, considering materials that are commercially available and offer significant potential for emissions reduction Assessing the suitability and applicability of alternative reinforcement materials to transport infrastructure in Australia and New Zealand, including quantitative and qualitative comparisons with steel reinforcement, considering technical performance, sustainability, cost, availability and transport aspects, and recognising that properties such as stiffness and failure modes may affect material selection, design and appropriate applications Assessing the potential sustainability and whole-of-life benefits of alternative reinforcement materials, including lower embodied carbon (A1-A3), lower whole-of-life carbon (A1-C4), improved corrosion resistance, lighter weight, increased durability, extended asset life and end-of-life considerations Assessing market and supply readiness, including the availability of relevant products internationally, nationally and by region, and the implications of transporting materials to asset-build locations, including associated emissions (A4) Examining barriers to adoption, including limitations in available performance data, gaps in standards, restrictive specifications, procurement considerations and cost Identifying potential updates or additions to Austroads Technical Specifications that may support appropriate use and broader adoption of alternative reinforcement materials (preparation or amendment of the specifications themselves is outside the scope of this project) Interim Deliverables, Phase 1 Project plan Research synopsis Interim Deliverables, Phase 2 Literature review Stakeholder consultation Draft Technical Report Final Deliverable Technical Report

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.