Diesel Generators and Supply - Sunny Corner Wind Farm - Wind farm and battery (BESS) project
Tender Overview
About this tender
Sunny Corner Wind Farm seeks suppliers for diesel generators and fuel supply services supporting their wind farm and battery energy storage system (BESS) project in New South Wales. The project requires supply and delivery of diesel, provision of diesel generators for hire, and on-site self-bundled double-walled fuel storage tanks. This tender is currently open and welcomes submissions until 31 December 2026.
Frequently asked questions
- The tender requires supply and delivery of diesel, provision of diesel generators for hire, and provision of on-site, self-bundled double-walled fuel storage tanks.
- The project is located in New South Wales, with potential sites across multiple regions including Central West, Far North Coast, Far West, Hunter, Illawarra, Mid North Coast, Murray, New England, Orana, Riverina, Southern Highlands, and Sydney.
- This is a wind farm and battery energy storage system (BESS) project that requires power generation support through diesel generator services.
- Submissions must be received by 31 December 2026.
- The tender reference number is 612142.
- This tender is current and actively accepting submissions from qualified suppliers.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Submission deadline: 31 October 2026
Substation - Lambruk Solar Farm
- Submission deadline: 31 December 2026
Overhead Power Lines - Coonerang Wind Farm and Battery (BESS) Project
- Submission deadline: 31 December 2026
Overhead Power Lines - Sunny Corner Wind Farm - Wind farm and battery (BESS) project
- Submission deadline: 01 February 2027
Supply of LV Transformers - Sydney Metro West-Linewide
- Submission deadline: 31 March 2027
Auxiliary Power Units - APU - Future Fleet Program
- Submission deadline: 31 March 2027
Electric Motors - Future Fleet Program
