Enmore Park & Gadigal Reserve Lighting Upgrades
Tender Overview
About this tender
Overview Inner West Council is seeking a fee quotation from a Design and Construct (D&C) Contractor to oversee design and construction services for lighting upgrades at Enmore Park and Gadigal Reserve, including investigations, sub-consultant engagement, required approvals, detailed design, construction documentation and construction services. About Council proposes to upgrade pedestrian lighting at two sites: Site A: Enmore Park, located between Enmore Road and Black Street in Marrickville (NSW 2204) Site B: Greenway entrance at Gadigal Reserve, located at 1 Grosvenor Crescent in Summer Hill (NSW 2130) The proposed area for providing additional lighting includes the portion of Enmore Park between Enmore Road and Victoria Road, and along internal pathways between the corner of Enmore Road / Victoria Road and the Annette Kellerman Aquatic Centre (near the corner of Llewellyn Street and Black Street) where lighting does not currently exist. The approximate extent for lighting upgrades at Enmore Park is 375 lin. m, subject to refinement following site investigation and detailed design. The Gadigal GreenWay entry point accessed via Grosvenor Crescent requires investigation and implementation of appropriate lighting improvements. The approximate extent for lighting upgrades at this location is 90 lin. m, subject to refinement following site investigation and detailed design. It is Council's intention to design and deliver lighting upgrades at both sites which meet appropriate Australian Standards and match, where possible, the existing WE-EF light poles, luminaires and fittings at each location. Purpose The purpose of this engagement is to complete site analysis and investigation, develop preliminary concept design, obtain relevant approvals, deliver detailed design and construction documentation, and oversee construction for the agreed Scope of Works. The D&C Contractor is to engage all necessary subconsultants and subcontractors to complete the required works. Scope The project scope encompasses the following stages: Stage 1: Site Analysis and Investigations Stage 2: Lighting Design Criteria Stage 3: Concept Lighting Design Stage 4: Detailed Design Stage 5: Approvals and Construction Documentation Stage 6: Procurement and Pre-Construction Stage 7: Civil and Electrical Construction Stage 8: Testing, Commissioning and Night Inspection Stage 9: Handover and As-Built Documentation Stage 10: Defects Liability and Post-Completion Review
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 1 day25 November 2026, 03:00 PM Australia/Sydney
Terry Tongarra Left Slip Lane - Utility Relocation Services
- Submission deadline: 26 November 2026
Conduit - Muswellbrook Solar Farm and Bess
- Submission deadline: 26 November 2026
Cable Ladders - Muswellbrook Solar Farm and Bess
- Submission deadline: 26 November 2026
Lightning - Muswellbrook Solar Farm and Bess
- Submission deadline: 26 November 2026
Cable Hangers - Muswellbrook Solar Farm and Bess
- Submission deadline: 26 November 2026
Electrical Consumables - Muswellbrook Solar Farm and Bess