Kirkham Road Water Main - Construction
Tender Overview
About this tender
Council (the Principal) is seeking Tenders from appropriately qualified and experienced Contractors to deliver a new 100mm ID HDPE reticulation water main between Kirkham Road and Evans Lane in Bowral, NSW. Scope of Works In achieving the objective identified in Section 3, the general scope of work includes, but is not limited to, the following: Project Management Deliverables for review by the Principal. Post SG11 Audit. Pre and post Dilapidation Reports. Investigative works and confirmation of service locations. Development of construction methodology and an under bore design for review and Approval by the Principal. Traffic Management as required. Closure of Evans Lane and traffic management of resident access. Affected Resident letter notifications. Installation of the new 100mm ID HDPE pipeline between Kirkham Road and Evans Lane. Connections of the new main to the two connection points. Pre-commissioning, commissioning and disinfection works of the new main as per the Specifications. Restoration of disturbed areas. Submission of warranties, quality, handover documentation and WAE. Primary contact: Kristian Draxl procurement@wsc.nsw.gov.au 1300 680 888
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.