Permanent Capping of Landfill Cells 1, 2A and 2B - Detailed Design
Tender Overview
About this tender
Overview Lismore City Council is seeking a consultant to prepare a Detailed Design for the permanent capping of landfill Cells 1, 2A and 2B at the Lismore Recycling and Recovery Centre (LRRC). About Council has developed a Concept Design for the Cell 1 permanent capping works (SMEC, 2026), which is provided as the Reference Design for this engagement. A separate geotechnical assessment has also been prepared for Cell 2B (CMQ, 2025). This assessment is more limited in scope but is to be considered by the Consultant as part of the Reference Design and incorporated into the Detailed Design where relevant. Purpose The Detailed Design is required to support long-term landfill closure, environmental protection and compliance with NSW EPA requirements. Scope The works are intended to be delivered in two stages and two packages, comprising Cell 1 and Cell 2A capping works (Package 1) and Cell 2B capping works (Package 2). The Detailed Design under this engagement must address both stages and packages and define the required interface between them. The scope includes: Detailed site investigation, design development, value management optimisation and Detailed Design for Cells 1, 2A and 2B Preparation of a Detailed Design for Package 1 (Cell 1 and Cell 2A, 2A being partial to the maximum extent possible, capping works, anticipated construction in 2027) and Package 2 (Cell 2A uncapped/interface portion and Cell 2B capping works, anticipated construction in 2034), with each package documented separately, including drawings, technical specifications, bill of quantities, supporting reports and other required design documentation Definition of the interface between Package 1 and Package 2, including limits of work, tie-in requirements, staging assumptions and any design constraints that must be preserved for future works Preparation of an operational filling model for Cell 2A and Cell 2B to guide ongoing filling operations and ensure compatibility with the future capping design The Services are structured as follows: Scope Item 1 – Project Management Scope Item 2 – Existing Information Review Scope Item 3 – Geotechnical Investigations and Assessment Scope Item 4 – Design Development and Value Management Optimisation Scope Item 5 – Construction Hazard Assessment Implication Review (CHAIR) and Safety in Design and Construction Staging Scope Item 6 – Detailed Design – 70%, 90% and 100% IFC Gates Scope Item 7 – Construction Quality Assurance (CQA) Framework Scope Item 8 – Waste Exhumation Management Plan Scope Item 9 – Cell 2A and 2B Future Interface and Operational Filling Model
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 1 day23 October 2026, 03:00 PM Australia/Sydney
Hurstville West - Laydown Maintenance Area - Design Services
- Closes in 1 day23 October 2026, 03:00 PM Australia/Sydney
Austral New PS (4th & 13th) and Figtree Hill, Gilead New PS - Project Management Services (Phases 1-2; Optional Phases 3-9)
- Closes in 1 day23 October 2026, 03:00 PM Australia/Sydney
Cadastral Site Survey for Proposed Subdivision - Old Athletics Field Lot 102/ DP 1262475
- Closes in 2 days23 October 2026, 04:30 PM Australia/Sydney
The Hills Design Advisory Panel 2027-202
- Closes in 3 days25 October 2026, 12:00 PM Australia/Sydney
Water Main Renewal - Little Motleys Bridge HDD - Rodeo Drive, Bowraville NSW
- Submission deadline: 26 October 2026, 12:00 PM Australia/Sydney
Composite Materials Capability
