Road Safety Improvements- Grose Vale Road & The Drift Way

Closes in 10 daysSubmission deadline: 01 December 2026, 03:00 PM Australia/Sydney

About this tender

Overview Hawkesbury City Council is seeking a contractor to undertake road safety improvement works at multiple locations along Grose Vale Road and The Driftway–Angus Bank, including Grose Vale Road, Grose Vale and The Drift Way, Agnes Banks. About The road safety improvement works have been included in Hawkesbury City Council's Capital Works Program and are funded by Transport for NSW (TfNSW) under the Black Spot Program. Purpose The improvements aim to enhance road delineation, address identified high-risk locations, improve road user safety, and increase the overall condition, functionality and long-term serviceability of the road network. Scope The scope includes: Installing road safety barriers at identified high-risk locations Widening road shoulders Rehabilitating and resurfacing deteriorated pavement sections Undertaking pavement reconstruction where required Renewing pavement line marking General Scope of Work Site establishment and demobilisation, including site facilities, security fencing, sediment and erosion controls, dust and noise controls, and material storage areas, with reinstatement of affected areas upon completion Preparation and submission of Project Safety documents including a Project Quality Control Plan, Safety Management Plan (SMP), Environmental Management Plan (EMP), Construction Management Plan (CMP), Safe Work Method Statement (SWMS), Construction Methodology statement, Erosion and Sediment Control Plan and Dilapidation Report Coordination with residents, property owners and relevant stakeholders, including delivery of Council-approved construction notification letters at least one week before works commence and arrangement of temporary vehicle relocation where required Construction set-out and survey of existing pavement surface levels at 20 m intervals across the full road width, including establishing and verifying design levels for each pavement layer and the finished pavement surface Review of BYDA plans and electronic service locating and potholing to confirm underground service locations and depths before excavation, and protection, relocation or adjustment of conflicting services in coordination with relevant authorities and Council Clearing of table drains and removal of vegetation, roots, rubbish and other unsuitable materials, with disposal at approved facilities Compliance with inspection and test requirements, including pavement reconstruction hold points, and notification of Council's Project Manager or Surveillance Officer to obtain hold-point releases before proceeding Waste classification testing and separate disposal of unsuitable excavated pavement and subbase material as Excavated Road Pavement Material (ERPM) at a licensed waste management facility, with waste disposal receipts and weighbridge dockets provided to Council Implementation of measures to minimise construction noise, dust, emissions and disruption to surrounding properties Preparation and submission of Work-as-Executed (WAE) drawings certified by a suitably qualified registered surveyor, final site cleaning and reinstatement, and formal handover of the completed works to Council Traffic Management Preparation and submission of a site-specific Traffic Management Plan (TMP) and certified Traffic Control Plans/Traffic Guidance Schemes (TCPs/TGSs) for Council review before implementation Provision, maintenance and removal of traffic controls, barriers, delineation devices, signage and traffic controllers in accordance with approved plans and relevant standards Maintaining two-way, one-lane traffic flow at all times unless otherwise approved by Council, with safety barriers and buffer zones separating construction activities from live traffic and additional precautions during peak traffic periods Installation of at least two Variable Message Signs (VMS) at either end of the work site, and an additional unit at any affected connecting road where required, installed at least seven days before mobilisation and maintained and updated throughout construction Provision and maintenance of safe pedestrian access throughout the construction period Coordination of temporary relocation of vehicles parked within the work zone, with advance notification to affected residents of driveway access restrictions and measures to minimise disruption Construction Scope of Work: Road Safety Improvements Supply and installation of road safety barriers at identified high-risk locations in accordance with the issue for construction (IFC) design, including end terminals, transitions, posts, delineators and associated safety treatments, complying with approved designs, relevant Australian Standards and road authority requirements Widening of existing road shoulders at nominated locations, including associated clearing, earthworks, pavement construction and drainage adjustments, tying the widened shoulders into the existing pavement to provide a safe and consistent road surface Pavement rehabilitation, reconstruction and resurfacing at designated locations in accordance with approved designs and specifications, including appropriate pavement levels, drainage and tie-ins to existing road infrastructure Instructions to Tenderers Tenderers shall thoroughly review all design drawings, Bill of Quantities (BOQ)/Schedule of Rates, pavement investigation and design reports, specifications, the Technical Scope and all other documents forming part of the Request for Tender (RFT). Tenderers shall include in their submitted tender price all labour, materials, plant, equipment and other costs necessary to complete the Contract Works in accordance with the RFT documentation. Any work or item required by the drawings, specifications, reports or other RFT documents but not expressly listed in the BOQ/Schedule of Rates shall be deemed included in the tender price. Tenderers shall ensure that their submissions address the complete scope of works and all relevant, mutually explanatory RFT documents. Where any discrepancy, inconsistency, ambiguity or conflict is identified between the RFT documents, Tenderers shall seek clarification from Council before submitting their tenders. Tenderers shall not make assumptions regarding the interpretation or precedence of the documents.

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.