Steel Supply and Formwork and other fabricated steel products - Hills of Gold Wind Farm

Closes in 344 daysClose date: 30 June 2027

Tender Overview

617774
Issued by Someva Pty Ltd
New South Wales : New England
Building Products & Materials : Steel Products Building & Facility Construction & Maintenance Services : Formwork & Steel Fixing

About this tender

Someva Pty Ltd is seeking steel supply and formwork services for the Hills of Gold Wind Farm project in New England, NSW. The tender covers reinforcement steel for wind turbine foundations, concrete formwork and consumable materials, and fabricated steel products including potable water, rainwater and fire water tanks. Locally milled steel is particularly sought. Suitable suppliers include NSW-based steel fabricators, rebar and mesh suppliers, formwork contractors, and tank fabricators with capability to service regional NSW wind-farm construction sites.

Frequently asked questions

The tender requires reinforcement steel for wind turbine foundations, concrete formwork and consumable materials, and fabricated steel products including potable water, rainwater and fire water tanks.
The project is located in New England, New South Wales.
Someva Pty Ltd is the agency managing this tender.
The tender is suited to NSW-based steel fabricators and suppliers, rebar and mesh suppliers, formwork contractors, and tank fabricators with capability to service regional NSW wind-farm construction sites.
Yes, locally milled steel is particularly sought for this tender.
The tender reference number is 617774.

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up