Warren St Pumping Station Sewer Rising Main Isolation Valve
Tender Overview
About this tender
Overview Essential Water invites quotations from suitably qualified and experienced contractors for the supply and installation of a new isolation valve on the 450 mm ductile iron cement-lined sewer rising main servicing the Warren Street Sewer Pumping Station in Broken Hill. Scope The scope includes: Supply and installation of a new isolation valve on the 450 mm ductile iron cement-lined sewer rising main servicing the Warren Street Sewer Pumping Station Installation using the preferred methodology of live line works, incorporating under-pressure tapping and valve installation, to enable the sewer rising main to remain operational throughout the works and minimise service interruptions Site Inspection A site meeting will be held for this opportunity. Date: Wednesday 29 July 2026 Time: 1:00pm Address: 7 Warren Street, Broken Hill NSW 2880 Site Contact: Brenton Oldsen Email: brenton.oldsen@essentialenergy.com.au Phone: 0407 231 646
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
