Yarrol Trail Crossing & Munwonga Crossing
Tender Overview
About this tender
Overview DCCEEW is seeking a contractor to construct and replace water crossings as part of the Gwydir RWC Program, which aims to improve the efficiency and effectiveness of Water for the Environment (WftE) deliveries to better meet the needs of water dependent communities across the Gwydir wetland and wider floodplain. Purpose The new WftE regime will enable higher flow rates than is the current practice. The proposed intervention is to raise the operational flow limit for discretionary water for the environment from 250 ML/d to 450 ML/d at Millewa GS (Lower Gwydir) and Teralba GS (Gingham). To enable the delivery of higher flows, several existing crossings require re-design and construction. Scope The scope includes: Construction of a new rock water crossing at 5819 Gingham Road, Garah, NSW, 2405 Replacement of an existing water crossing within Gwydir Wetlands State Conservation Area, Bullarah, NSW, 2400 Instructions to Tenderers Supplier Account All suppliers must have a Supplier account on Supplier Hub to download and lodge responses. To create a Supplier account, suppliers can go to https://buy.nsw.gov.au/login/signup. Notifications To receive notifications about this opportunity (addenda, notices etc.), suppliers must either save the opportunity to their dashboard or have started a draft response. Lodging a Response Tenders must be lodged via the buy NSW Tenders platform, in accordance with the Conditions of Tendering. Tenders must not be submitted via email. Late submissions cannot be accepted, so suppliers are advised to upload their submission earlier in the day, as delays and disallowed files may be experienced. Suppliers should click the RESPOND button to submit their electronic tender response. Responses must be submitted into the buy NSW system before 3pm on the close date. Responses can be submitted and edited multiple times until the opportunity closes, with only the most recent submission being considered. buy NSW Tenders Help If technical difficulties are experienced when submitting a tender, suppliers can contact the buy NSW team at buy.nsw@customerservice.nsw.gov.au or 1800 679 289. Enquiries Primary contact: Harvey Carnall Email: harvey.carnall@pwa.nsw.gov.au Phone: 0438835740
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 3 days23 November 2026, 03:00 PM Australia/Sydney
Bitumen Sealing Works- Cooma & Jindabyne
- Closes in 3 days24 November 2026, 12:00 PM Australia/Sydney
Henry Lawson Dr Pedestrian Refuge
- Closes in 3 days24 November 2026, 02:00 PM Australia/Sydney
Construction of Halekulani and East Gosford Skateparks
- Closes in 3 days24 November 2026, 02:00 PM Australia/Sydney
RFT Remediation Works - Multi-storey Carpark, Wilson Road, Terrigal
- Submission deadline: 24 November 2026, 03:00 PM Australia/Sydney
Kempsey West PS and Nambucca Heads PS - Replace Retaining Walls
- Submission deadline: 26 November 2026, 11:00 AM Australia/Sydney
Design and Construct -Tamworth CBD Levee Stormwater Relining