Open government and public tenders
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Overview Arafura Rare Earths Pty Ltd is inviting Expressions of Interest (EOI) for Package PM158, Dust Collectors, for the Nolans Rare Earths Project in the Northern Territory. About Arafura Rare Earths Limited is an Australian, ASX-listed company (ASX:ARU) focused on the responsible future production of the rare earths elements Neodymium and Praseodymium (NdPr) and heavy rare earths from its Nolans Project in the Northern Territory. The Nolans Project, located 135 kilometres north of Alice Springs, is a fully permitted, construction-ready, single site ore-to-oxide project with an anticipated mine life of 38 years. As a fully integrated operation, Nolans will encompass a mine, process plant (comprising beneficiation, extraction and separation plants) and related infrastructure. The Project is recognised as a globally significant and strategic NdPr project which, once developed, will become a major supplier of these critical minerals to the high-performance NdFeB permanent magnet market. The Nolans Project has made strong progress during the first half of FY2026 and remains on track towards a Final Investment Decision (FID), subject to completion of funding and offtake arrangements. Hatch has been appointed as EPCM contractor for the Nolans Project, and Arafura is transitioning execution management of the Project to Hatch. As the execution plan and procurement packaging are finalised, Hatch will be the primary contact for procurement and contracting engagement. Scope The scope for Package PM158, Dust Collectors, encompasses the complete design, supply, QA/QC, fabrication, protective coating, pre-assembly, packaging, and delivery of fully functional dust collector systems and associated equipment within the defined battery limits. The scope includes: Dust collector bodies, filter elements and bags, and bag cleaning systems Induced draft fans, air dilution dampers, and off-gas stacks Rotary valves and collection hoppers Reverse pulse jet systems Instrumentation and controls Ductwork, including linings, dampers, expansion joints, supports and access manways Platework, structural components, and base frames Lubrication systems, safety guards, nameplates, and equipment tags All associated accessories and ancillary items required for a complete and operable installation Design measures to minimise personnel exposure to radioactive dust during operation and maintenance All equipment, materials, accessories, and services necessary to achieve the specified performance requirements, whether specifically identified in the documentation or not, excluding thermal insulation and cladding, which will be provided by others Provision of all clips and brackets necessary to support the insulation system Contractor Requirements Provide resources illustrating capabilities specific to the contract on offer Demonstrate industry performance and compliance with Health, Safety, Environmental and Quality Management systems Confirm if equipment of this nature has been provided previously, with relevant references to earlier projects Complete and upload Prequalification documentation (H366551-PM158-311-024-0001-AT02), including requested and supporting documentation Complete and upload the Confidentiality Agreement (H366551-PM158-311-024-0001-AT03), with all highlighted sections completed and submitted in native format (the final document will subsequently be circulated for e-signing by both parties) Contract Terms and Conditions Tender Period: August to September 2026 Approximate Value: TBD Approximate Duration: Execution Phase, Q4-2026 to Q1-2029 How to Apply Interested parties are invited to express interest in this package by registering on the ICN Gateway online platform. Registration on ICN Gateway is mandatory for consideration of this EOI. Prior to registering, please ensure that: The company profile on ICN Gateway is complete, current, and accurate Interest is registered against this package as either a full-scope or partial-scope submission (where applicable) To be considered for this opportunity, interested parties must upload and submit all required documentation through the ICN Gateway portal only. Email submissions will not be accepted unless specifically requested. EOI Closing Date: 31 July 2026, however completed submissions may be uploaded at any time whilst the EOI is open. This EOI will be used, in part, to establish a list of potential tenderers, providing a general understanding of their capabilities to execute the scope outlined. The EOI will be coupled with subsequent steps and stages in the tender process to be adopted by Arafura Nolans Project Pty Ltd (the "Company"), and applicants' responses to this EOI shall not form any part of a commitment or agreement with or on behalf of the Company to proceed or contract with responding parties. The relevant package details outlined and/or scale of scope for this package may be subject to change at the discretion of the Company. Enquiries Contact: Industry Capability Network of Northern Territory, ICN NT Engagement Team Email: resources@icnnt.org.au Phone: +61 8 8922 9422
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.