Civil Construction Works – St George Industrial Subdivision
Tender Overview
About this tender
Overview Balonne Shire Council invites tenders from suitably qualified tenderers for civil construction works related to the subdivision of industrial land in St George. Scope The scope of work of this project includes but is not limited to the following items. Refer to the Issue for Construction (IFC) drawings 22.1003 Rev A for more details. Earthworks Remove existing trees Strip all topsoil, vegetation and unsuitable material Filling in existing drain and stormwater pit with select fill material Proof roll subgrade and replace any soft spots with approved fill material Road works Construct the proposed roads MC01, MC02, MC03 and MC04, as well as the road widening including the BAR/BAL turn treatments at Carnarvon Highway / Cliff Parsons Drive intersection and CHR(s)/BAL turn treatments at Carnarvon Highway / Buchan Bypass / Proposed Airport Road intersection Seal the proposed roads and intersections as per the seal design specified on the drawings Remove existing signage Install road signage and linemarking Install M3 kerb in accordance with IPWEA standard drawings Install 4m of flush kerb at cul-de-sac Install Type B heavy duty vehicle crossing Install concrete driveway Install table drain Install asphalt pavement over new reinforced concrete box culverts (RCBC) to tie into new surface Drainage Remove existing culverts Install 1200x300 RCBC and associated structures (MC01 CH10.172) Install 1200x300 RCBC and associated structures (MC03) Install 2/900x300 RCBC and associated structures (MC02 CH363) Install 900x300 RCBC and associated structures (MC02 CH506) Install rock scour protection at cul-de-sac drainage outlet Install precast sag gully pit to tie into new RCBC invert Miscellaneous Survey and locate any existing utilities Install erosion and sediment control measures Dispose waste and unsuitable material at BSC approved disposal location Remove existing telecommunication pit Relocate existing power pole Reinstate fence in new placement with current style The construction of water reticulation mains and fittings, sewer gravity main / rising main / pumps and the new toilet block are excluded from the scope of work of this tender. Instructions to Tenderers All queries and requests for information must be submitted through the forum portal to ensure everyone receives the same information at the same time.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.