Construct - Emerald Animal Management Centre
Tender Overview
About this tender
Overview Central Highlands Regional Council (CHRC or Council) is seeking qualified and experienced suppliers to carry out various works at the Emerald Animal Management Centre (AMC). The works are made available as Separable Portions. Scope The Works are made available as Separable Portions and comprise: Concreting Plumbing Roofing Fencing and Gates Brickwork Electrical Painting Grouting Modular Veterinary Room, Toilet and Office Storage Shipping Containers Works stipulated for the upgrade, repair, and renewal within the AMC compound are detailed in the Response Schedule, the Scope of Works in the Specification Document, and the Council supplied Upgrade Drawings (eleven in total). Areas within the AMC receiving these goods and services include: Inside the existing Dog Kennel Building, Kennels No 1 to 13 New outside Exercise Pens with insulated roof panels, Pens 1 to 9 New boundary fencing New internal fencing New sanitary drainage from the Dog Kennel Building, Exercise Pens, and Veterinary Room, Toilet and Office New Trade Waste Septic Tank New Pump Well Electrical works Removal of the central stormwater drain at the front of the Dog Kennel Building Installation of repair mortar, rapid screed, and waterproof membrane to the inside Dog Kennel Building floors Installation of waterproof membrane to the outside exercise pen floors Removal and renewal of front and side concrete paths New Vehicle Unloading Area trafficable concrete slab New Modular Veterinary Room, Toilet and Office Decommissioning of the existing trade waste septic tank and pump well Pressure pipe connection to the pressure rising main New storage shipping container (one) Relocation of the existing cattery shipping container from the rear to the front of the AMC New front gate, side maintenance access gate, and rear access gate Information Requested A Separable Portion Response Schedule has been prepared for use by the Contractor to accurately include and easily total costings in a discernible manner. This will allow for: Easy assessment of comparative cost breakdowns and pricing for different Separable Portions Preparation of progress claims with easily identifiable Asset Components and Trades Instructions to Tenderers Contractors are encouraged to tender for some or all Separable Portions. CHRC supplied drawings are listed in the Drawing Register, and a Pricing Schedule and Response Schedule are provided for use with the tender submission.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 3 days26 October 2026, 10:00 AM Australia/Brisbane
Preferred Supplier Panel for Minor Building Construction, Repairs and Maintenance
- Closes in 3 days26 October 2026, 12:00 PM Australia/Sydney
Lavarack Barracks Building works, QLD
- Closes in 3 days26 October 2026, 02:00 PM Australia/Brisbane
Lot 45 Dadamud Village, Erub (Asbestos Removal & New Works)
- Closes in 3 days26 October 2026, 03:00 PM Australia/Brisbane
Ports North The Company One Hatchery - HVAC Renewal
- Closes in 3 days26 October 2026, 03:00 PM Australia/Brisbane
Everton Park Junior Rugby Union Club– Master Plan Upgrade Works
- Submission deadline: 29 October 2026, 10:00 AM Australia/Brisbane
Principal Contractor - Design & Construct of Prosthetics, Orthotics & Podiatry Rooms at PAH
