EOIP 0003 - Aggreko Thermal Plant - Electrical and Comms Fit-out Scope EOI - Eva Copper Project
Tender Overview
About this tender
Overview Supply Aggreko is seeking Expressions of Interest from suitably qualified and experienced contractors for the electrical and communications fit out of the infrastructure associated with construction of the IPP Thermal Plant at Eva Copper Mine, in accordance with the relevant drawings and specifications provided by Aggreko. About Financial investment decision (FID) was obtained in late 2025, with construction expected to be completed around Q3 2028. In addition to the mining infrastructure, project construction will include an access road, onsite accommodation village, administration buildings, maintenance, training and first-aid facilities, and all other requirements necessary for operational readiness. Scope Facility Overview The thermal power generation facility comprises: 93 x 1.2 MVA Diesel Generators 32 x 1.5 MVA Synchronous Condensers 32 x 0.4/33 kV Step-Up Transformers 2 x Earthing Transformers 33 kV Switchgear 415V Distribution Switchboards Fuel system, UPS, Fire Panels, Offices, and Workshop Facilities The subcontract scope of work covers the Electrical and Communication services fit out for the Thermal Power Plant at the Eva Copper Mine Project. Scope of Work Breakdown The scope includes: Carry out cable pulls and terminations from the respective gensets to transformers Carry out cable pulls and terminations from the respective Synchronous Condensers Containers to transformers Carry out cable pulls and termination from the respective step-up Tx to switchgear Carry out cable pulls and termination for all LV switchboards Carry out cable pulls and termination from all LV switchboards to relevant sub distribution boards and facilities Complete switchboards mounting, terminations and internal electrical reticulation works Carry out cable pulls and termination of all instrumentation and comms Installation of communications rack, wall mounted cabinets, terminations, and internal communication reticulation works as per project requirement Installation of cable ladders, covers, brackets and supports to suit the reticulation requirements for designed works Complete all associated electrical works for the thermal plant, including external lighting and other minor lighting and power circuits Complete earth bonding of the substations, gensets, distribution boards and associated electrical equipment Testing of all HV, LV, and communications cables in accordance with the applicable Australian Standards and Aggreko/Harmony-supplied ITPs, including (but not limited to) ITRs, VICs, earthing continuity testing, and compliance verification Contractor Requirements Suitably qualified and experienced in electrical and communications fit out works of this nature Instructions to Tenderers Further details on the scope, including construction, electrical drawings, and specifications will be supplied during the RFQ stage. All other relevant documentation can be requested by confirming your expression of interest at tendersevacopper@aggreko.com.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Submission deadline: 29 November 2026
Fencing (Electric Security Fence) - Calvale to Calliope River Transmission Line Reinforcement Project
- Closes in 3 days30 November 2026, 04:00 PM Australia/Brisbane
Electrical Services
- Submission deadline: 02 December 2026, 04:30 PM Australia/Brisbane
Marlin Coast Wastewater Treatment Plant – Bypass Upgrade
- Submission deadline: 03 December 2026, 11:00 AM Australia/Brisbane
Maryborough Landfill - Machinery Wash Down Bay - Construction Works
- Submission deadline: 03 December 2026, 03:00 PM Australia/Sydney
Request for Quotation RAAF Base Scherger Upgrades Phase 2
- Submission deadline: 07 December 2026, 10:00 AM Australia/Brisbane
RFQ - Primary Moving Head Wash Replacement
