Forward Notification of Upcoming North Coast Line North Culvert Replacement

Advance notice — not yet open for submissionsExpected tender release: 13 January 2027 — indicative and subject to change

About this advance notice

Overview Queensland Rail Limited is providing forward notification of an upcoming tender for the North Coast Line Culvert Replacement project, which forms part of the North Coast Line Culvert Renewal Project. Purpose The North Coast Line Culvert Renewal Project forms part of Queensland Rail's ongoing program to improve the safety, reliability and resilience of the North Coast Line (NCL). Maintaining the condition and performance of drainage infrastructure is essential to protecting the track formation, managing flood risks and ensuring the ongoing reliability of rail operations. The existing culverts have been identified for renewal to address their deteriorating condition and maintain the long-term performance of the corridor's drainage infrastructure. Scope The scope includes: Replacement of six life-expired corrugated metal pipe (CMP) culverts Grout fill of two corrugated metal pipe (CMP) culverts Removal of existing culverts Construction of new reinforced concrete pipe (RCP) culverts in accordance with Queensland Rail's Issued for Construction (IFC) drawings Associated excavation Foundation preparation Culvert installation Construction of headwalls and wingwalls Scour protection Drainage improvements Formation reinstatement Access road reinstatement Protection or relocation of existing services, as required at each location

How to prepare for this planned opportunity

This is an advance notice and is not yet open for submissions. Use the lead time to prepare without assuming the final request or deadline.

Review the advance notice

Read the buyer’s planned scope and note that the release estimate is indicative and may change.

Check your capacity

Consider delivery capacity, geographic coverage and likely partner requirements ahead of release.

Prepare capability material

Collect relevant project examples, outcomes and credentials that may support a future response.

Recheck when released

Wait for a verified opening, then review the published requirements and submission deadline before deciding to respond.

Prepare before this opportunity is released

Build your capability material now, then review the request when it opens.

Sign up

Similar public opportunities

Related notices are labelled to show whether submissions are open or still being planned.