General Expression of Interest - Brigalow Peaking Power Plant Project BOP Construction

Closes in 6 daysClose date: 18 August 2026

About this tender

Overview Monadelphous is inviting expressions of interest from suppliers and service providers for the Brigalow Peaking Power Plant Project, Balance of Plant (BOP) Construction, a project being delivered for CS Energy. About Monadelphous is currently undertaking construction of the greenfield Brigalow Peaking Power Plant (PPP), a gas-fired power station being delivered for CS Energy. The Facility involves the construction of a nominal multi-unit 400 MW (nominal installed capacity at ISO conditions) natural gas fired power generation plant, with hydrogen blend capability, using 12 aero-derivative LM2500Xpress units (gas turbine and ancillaries package), designed for fast start operation. Scope Monadelphous requires suppliers and service providers for many different aspects of the Brigalow Peaking Power Plant Project Balance of Plant (BOP) construction works. How to Apply Please reply to this expression of interest outlining your capability and desire to be placed on a tender list for works on the project.

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up