Innisfail STP Access Road Bank Stabilisation

Closes in 21 daysSubmission deadline: 14 December 2026, 05:00 PM Australia/Brisbane

About this tender

Overview Cassowary Coast Regional Council is seeking a contractor for the stabilisation of the creek bank on Ninds Creek near the access road to Council's Sewage Treatment Plant at Innisfail. About Cassowary Coast Regional Council is continuously renewing and upgrading its water and sewer infrastructure across the region. This project forms part of that ongoing program. Scope This specification is for the supply and delivery of: 39 metres of Type AZ50 - 700N Sheet Piles, 15 metres long Rock protection to the creek bank The Works Under Contract include all labour, materials, consumables, plant, equipment and appliances to perform all work associated with the construction activities in accordance with the Contract, all relevant technical specifications, general specifications and documents referred to in these, standard drawings, annexures and relevant MRTS, FNQROC and Australian Standards. Works included in this Contract include, but are not necessarily limited to, the following. Preliminaries and Project Management Site establishment and disestablishment Provision for site facilities Provision for and implementation of traffic and pedestrian management (STP traffic only) Supply and implementation of Safety, Quality and Environmental Management Plans Survey and set out Service location Dial Before You Dig documentation and necessary protection required to protect services or infrastructure on site to avoid any damage Provision for compliance with electricity entity requirements working near overhead and underground electrical lines, including supply of RPEQ Certification for working within 5 metres of Ergon Stay Wires and Power Poles with Transformers attached Provision for compliance with SARA Approval Permits Removal of vegetation as per SARA Approvals (Council are to approve the removal of all trees) Provision for As Constructed drawings Construction, erection and maintenance of security fencing where required Clearing and grubbing of site and disposal of excess material Carrying out a dilapidation survey Supply and placement of backfill material as specified Supply and placement of Type AZ50 - 700N Sheet Piles, 15 metres long, with weepholes as specified in accordance with MRTS 66 Specifications Supply and placement of 200mm Amor Rock / Rip Rap and A34 Geofabric as specified in accordance with MRTS 03 Specifications Dewatering if required All temporary works required Demobilisation, cleaning of site and removal of temporary works and/or fencing, to the Superintendent's satisfaction Contractor Requirements Tenderers must comply with electricity entity requirements when working near overhead and underground electrical lines Tenderers must supply RPEQ Certification for working within 5 metres of Ergon Stay Wires and Power Poles with Transformers attached Instructions to Tenderers Council has included an item in the pricing schedule for the tenderer to price the costs involved with the RPEQ Certifications. Generally, the engineer gives instructions while the contractor is excavating within the 5 metre exclusion zone. Should the tenderer require the addition of extra items into the pricing schedule, they must request approval from Council. If approval is received, the tenderer must request that Council issue a revised Pricing Schedule as an addendum during the tender period.

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.