Monto WTP Reservoir Roof Replacement Options Assessment
Tender Overview
About this tender
Overview North Burnett Regional Council is seeking suitably qualified consultants to assess the existing Reservoir Two roof at the Monto Water Treatment Plant and recommend options for its future replacement. Purpose This engagement covers Stage One consultancy services. Council will use the findings to plan, budget and procure Stage Two. Scope The scope includes: Inspecting the existing Reservoir Two roof and accessible supporting elements at the Monto Water Treatment Plant Assessing options for future asbestos cement removal and disposal Comparing replacement roof systems Preparing a preliminary programme and estimates for future detailed design, removal and replacement Contractor Requirements Suitably qualified as a consultant to undertake this assessment
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 2 days30 November 2026, 02:00 PM Australia/Brisbane
Project Manager – Technical Planning (Sector 1 North)
- Closes in 3 days01 December 2026, 10:00 AM Australia/Brisbane
EOI Central Gold Coast GC Surfer (west) – Preliminary Design & Detailed Design
- Closes in 3 days01 December 2026, 11:00 AM Australia/Brisbane
South Bank Revitalisation – Process Deed Poll
- Closes in 3 days01 December 2026, 02:00 PM Australia/Brisbane
Preferred supplier arrangement for Flood Risk Management and Stormwater Services
- Closes in 3 days01 December 2026, 04:00 PM Australia/Brisbane
Augusta Parkway & Sinnathamby Boulevard Road Upgrade - Detailed Design
- Submission deadline: 02 December 2026, 11:00 AM Australia/Brisbane
Register of Prequalified Suppliers (ROPS) Registered Surveyor Services