Sodium Hypochlorite Package 2 - Little Mulgrave Reservoir (Package 2)
Tender Overview
About this tender
Overview Cairns Regional Council is inviting submissions from suitably qualified and experienced contractors for Contract 3090, construction installation works for new Chemical Storage Facilities and Unloading Bay at Council's Sodium Hypochlorite delivery site at Little Mulgrave Reservoir (Package 2). Scope The Contractor shall supply all labour, supervision, materials, plant, equipment, consumables and temporary works required to complete the works at both sites in accordance with the reference drawings, specifications and the Scope of Work, including but not limited to: Site establishment, traffic management, environmental controls and temporary fencing Temporary chemical dosing arrangement to maintain water supply during outage (design endorsed in writing by the Principal; system becomes Council property) Civil works for new chemical unloading bay (Type 1) including bund, isolation sump, ramps and surface reinstatement Supply and installation of vendor designed sodium hypochlorite fill panel package per SH-TD-GLO-106, including pipework, valves, instrumentation, controls, alarms, GPO and labelling Double contained chemical pipework outside bunded areas (George Fischer "Double-See" or approved equivalent) Chemical resistant polyurethane bund coating (Epimax 225/333AR or Metz 93PU) Integration with existing site PLC and SCADA New safety shower (minimum 140 LPM @ 250 kPa), with booster pump if site pressure is inadequate Bollards, vandal-proof enclosures, signage and lockable cam-lock caps Commissioning, testing, training, as-built documentation and operations and maintenance manuals Civil Works Site establishment and access management Existing service locating through Dial Before You Dig, site specific survey data and non-destructive excavation (where required) prior to works to ensure services are not impacted Civil site preparation inclusive of site survey, with the contractor to determine the outfall location on site ensuring a minimum 0.5% gradient from sump prior to commencing trenching Disposal of existing sodium hypochlorite building Civil foundation, excavation and preparation Civil construction as per drawings and technical specification provided (DWGs SH-G-SHB-001, SH-G-SHB-002, SH-G-SHB-003, SH-LM-RWP-002), with backfill and rehabilitation to existing condition to be completed prior to demobilisation where trenching and/or excavation has been conducted for new or re-routed services Structural Installation of new Sodium Hypochlorite building, with material supply and construction as per design detail (DWGs SH-G-SHB-001, SH-G-SHB-002, SH-G-SHB-003), including installation of a 400mm high bund wall inside the new building and a 150mm high pump plinth (utilising existing if possible, otherwise installing new) Installation of new concrete slab for the new Chemical Unloading Bay, Type 1, as per design detail (SH-TD-GLO-101, SH-TD-GLO-102), including an isolation sump with grated cover (installed per orientation on DWG SH-LM-RWP-002), external bund access ramp, outlet pipe and bollards fixed to nib wall, with existing water and electrical services to be located prior to works Installation of concrete slab between the new sodium hypochlorite building and new chemical unloading bay, Type 1, falling towards the bund at a minimum 0.5% gradient with levels coordinated on site to suit the bund, including installation of a 100mm x 100mm concrete nib to contain spills Mechanical Diversion of all existing services to and from the new sodium hypochlorite building and decommissioning and removal of redundant lines, with diversion routes confirmed with the Project Manager onsite, including the recirculation suction line, analyser feed line, recirculation discharge line and safety shower feed line, with reticulation and dosing pipework to match the existing installation (generally DN50 Grey PVC Sch80) Installation of new mechanical infrastructure including dosing pump and concrete plinth, recirculation pumps and pipework, safety shower and safety shower booster pump with cover, with allowance for replacement of any equipment that cannot be relocated, is damaged during relocation, or is otherwise required to facilitate integration into the new building Installation of new 1000L polyethylene tank fitted with clear sight tube, isolation/drain valves and flexible coupling, new DN25 fill pipework and cam-lock mounted to wall at nominated location (or approved alternative) with DN25 siphon break loop and DN10 flexible tube siphon break line, and new DN25 perforated inlet pipe Mechanical infrastructure for the new Unloading Bay, Type 1, material supply and installation as per DWGs SH-GN-GLO-101, SH-TD-GLO-103, SH-G-MES-001, SH-LM-RWP-002, including a DN150 drainage pipeline from the isolation sump with valve and valve box, and a new precast concrete headwall (Rocla or approved equivalent), with the contractor to confirm the location to ensure free drainage (not required when tying into an existing outlet headwall structure) Electrical, Communications and SCADA Diversion of all existing electrical and communications services to and from the new sodium hypochlorite building and decommissioning and removal of redundant lines, with diversion routes confirmed with the Superintendent onsite New ceiling lighting installed within the sodium hypochlorite building Installation of two new junction boxes on the outside of the sodium hypochlorite building Electrical and communications infrastructure for the new chlorine chemical buildings, material supply and construction as per DWGs SH-LM-RWP-002, SH-G-MES-001, SH-G-SHB-002 Contract Terms and Conditions Construction must be sequenced to ensure all new buried services are installed and existing services are relocated before surface infrastructure works begin The proposed construction sequence and program must be reviewed and approved by the Client's Superintendent prior to the start of work Tenders are to remain valid for a period of 120 days from the Closing Time Instructions to Tenderers Completed responses must be lodged by uploading the submission to Tenderlink, using the response forms within the tender documentation It is recommended that tenderers begin uploading their tender submission files at least two (2) hours before the tender closing time Submissions must be fully received by the closing time; late, verbal or emailed tenders may not be accepted and will be subject to Council's sole discretion Submissions will not be opened publicly, and the lowest or any tender may not necessarily be accepted Council reserves the right to change the specifications prior to making a decision on the submissions received Council may invite all Respondents to change their submission to take into account any change in the tender specifications Enquiries Tender enquiries, questions or clarifications should be directed via the online forum. Cairns Regional Council officers are unable to respond to verbal enquiries in relation to the tender. The forum will close three days prior to the closing time and date, and all questions, information requests and clarifications should be posted prior to this time.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 2 days23 November 2026, 02:00 PM Australia/Brisbane
Design and Construct - Primary Healthcare Upgrade Texas MPHS
- Closes in 3 days24 November 2026, 02:00 PM Australia/Brisbane
GECC Counterweight Fly System Rectification & Modernisation
- Submission deadline: 25 November 2026, 03:00 PM Australia/Brisbane
QED 6556 2026 - Bli Bli State School - Walkways and Ramps
- Submission deadline: 25 November 2026, 04:00 PM Australia/Brisbane
Place and People Access and Functionality Upgrade Tully Admin (Dorothy Jones Library)
- Submission deadline: 26 November 2026, 11:00 AM Australia/Brisbane
Burgowan WTP - Sludge Dewatering Facility - Construction Works
- Submission deadline: 26 November 2026, 02:00 PM Australia/Brisbane
ROI- Roma Street Connect Main Works Package
