Sunshine Motorway Between Maroochydore Road Interchange and North Connection Road Interchange - Sunshine Motorway Resurfacing project (Chainage 5.87-13.4km)

Closes in 28 daysClose date: 30 September 2026

About this tender

Overview QBuild (QLD) is seeking a suitably prequalified contractor to undertake the Sunshine Motorway Resurfacing project, located on the Sunshine Motorway between the Maroochydore Road Interchange and the North Connection Road Interchange, chainage 5.87km to 13.4km. Scope Resurfacing of the Sunshine Motorway between the Maroochydore Road Interchange and the North Connection Road Interchange (chainage 5.87km to 13.4km) Construct only works Contractor Requirements TMR Prequalification: Major A3 Minor, R2, Financial F25+ TIC Construct Only category

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up