Supply & Installation of Cell 6 and Cell 7 Landfill Liner System Nambour Landfill Expansion
Tender Overview
About this tender
Overview Sunshine Coast Council is inviting tenders for the supply, installation, testing and certification of the Cell 6 and Cell 7 Sidewall Liner System for the Nambour Landfill Expansion Project, located at 18 Cooney Road, Bli Bli. Scope The scope includes: Supply and installation of geosynthetic liner components, comprising HDPE geomembrane and protection geotextile, for Cell 6 Sidewall Liner Lifts 2 and 3 Supply and installation of geosynthetic liner components, comprising HDPE geomembrane and protection geotextile, for Cell 7 baseliner and piggyback lift 1 Testing and certification of the installed liner system Provision of all materials, plant and labour required to perform the works associated with the contract Council will be completing the civil construction and liner surface elements to the liner receiving surface specified levels and tolerances. Contract Terms and Conditions This is a lump sum contract Anticipated commencement: 1 December 2026 Anticipated practical completion: 30 June 2027 Tender Briefing and Site Inspection A site information session will be held in accordance with the details provided in Schedule 2 of the Invitation to Tender.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
