Manufacture and Supply - Apron Feeder - (Ref - ALP115-018) - Carrapateena Expansion Stage 2 Project (CXPS2)

Open for submissionsSubmission deadline: 11 November 2026

About this tender

Overview BHP Group Ltd is seeking a supplier to manufacture and supply an Apron Feeder for the Carrapateena Expansion Stage 2 Project (CXPS2), reference ALP115-018. Scope The scope includes: Supply of preliminary and detail design data, issue of drawings and documents for review, statutory compliance and certification (PCF1 SOW) Manufacture and supply of 1 off ROM Apron Feeder with 2417 tph (wet) max design capacity @ 0.04 m/s speed, complete with chassis, support frame, impact rails, pans, chains, carry rollers, return rollers, shafts, sprockets, tail idler, bearings, chain tensioning mechanism, lubrication system, controls and drive, 12350L x 2950W Manufacture and supply of 1 off Spillage Conveyor below the ROM apron feeder, complete with drives, pulleys, idlers, belts, belt scrapers, stainless spillage chute supported from the apron feeder chassis and a rubber dribble chute Manufacture and supply of 1 off COB Apron Feeder with 2195 tph (wet) max design capacity @ 0.19 m/s speed, complete with chassis, support frame, impact rails, pans, chains, carry rollers, return rollers, shafts, sprockets, tail idler, bearings, chain tensioning mechanism, lubrication system, controls and drive, 7320L x 1650W Enquiries Project Primary Contact Alex Vojdani, Supply Chain Manager Phone: +61 04 4727 7175 Email: alex.vojdani@icnsa.org.au Project Secondary Contacts Eddie Ivar, ICN South Australia Email: eddie.ivar@icnsa.org.au

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.