Upper Lake Margaret Redevelopment – Substation and Transmission Line

Closes in 29 daysSubmission deadline: 23 December 2026, 02:00 PM Australia/Hobart

About this tender

Overview Hydro Tasmania is seeking Expressions of Interest for a Substation and Transmission Line Construction Services package associated with the Upper Lake Margaret Redevelopment. This document provides a high-level description of the potential package to inform potential contractors of the scope of works and project that will be assessed under the Upper Lake Margaret Redevelopment – Substation and Transmission Line EOI. About The Lake Margaret Scheme is located approximately 10 km north of the township of Queenstown on the west coast of Tasmania, Australia. The scheme consists of the Upper and Lower Power Stations and is a historically significant hydroelectric development supplied from the Yolande River catchment. The Upper Lake Margaret Power Station was commissioned in 1914. Water is conveyed from Lake Margaret through approximately 2.2 km of woodstave pipeline that was replaced in 2009, before passing through steel penstocks to the power station. The station contains seven horizontal Pelton generating units with a combined installed capacity of 8.3 MW. Much of the electrical and mechanical equipment has exceeded its design life, with some assets now more than 110 years old, and multiple units are currently out of service. The Lower Lake Margaret Power Station is located approximately 2.5 km downstream of the Upper Power Station. Originally commissioned in 1931, the station was redeveloped and recommissioned in 2010. Its operation is hydraulically dependent on discharge from the Upper Power Station. As part of the Lake Margaret Redevelopment Project, Hydro Tasmania intends to replace the existing seven-unit Upper Power Station with a single peaking generating unit housed within a new powerhouse. The redevelopment will retain the existing dam, woodstave pipeline and penstock infrastructure where practical, while replacing the ageing electrical and mechanical plant with a modern generating unit designed to improve reliability, maintainability, operational flexibility and long-term asset performance. The site is historically significant, remote and constrained by existing assets, access, terrain and river conditions. Purpose This document defines the current reference scope, principal interfaces, anticipated Owner-supplied items and exclusions for the Substation and Transmission Line Construction Services package so that contractor input can be obtained during project development and the package can be progressively refined for procurement and delivery. The scope is based on the feasibility design and remains subject to design development, statutory approvals, OEM information, interface definition, delivery model review and Final Investment Decision. Battery limits, quantities and detailed responsibilities are not fully defined. The Contractor is expected to identify gaps, overlaps, constructability issues and preferred responsibility allocations as the package develops. Objectives The Substation and Transmission Line Construction Package is intended to deliver a safe, fit-for-purpose and maintainable grid connection that enables redevelopment of the Upper Lake Margaret Power Station while integrating with existing retained infrastructure and respecting the heritage significance of the site. Scope The scope includes: Replacement of the existing transmission line with a new single circuit, hybrid transmission distribution 22kV line back to the Point of Connection (POC) outside the Queenstown substation Delivery of a new 22/11kV substation and associated civil, structural and electrical services interfacing, suitable for long-term operation of a modern hydroelectric generating plant Vegetation clearing along the easement to ensure an adequate fire barrier Reconnection of the new 11kV power supply to the existing ancillary site connections to the headworks, village and Lower Lake Margaret Station Coordination of site interfaces between the substation and transmission line, powerhouse construction package, TasNetworks, the existing asset integration package, and Hydro Tasmania owner activities and enabling works

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up