Brine Street Childcare Outdoor Learning Area Renewal
Tender Overview
About this tender
Overview The City of Monash is inviting tenders for the design and construction of a refurbishment of three outdoor play spaces at the Brine Street Childcare Centre in Hughesdale. About Brine Street Early Learning Centre provides education and care for up to 67 children each day. The Centre's three outdoor play areas have not undergone significant renewal since 1998 and are approaching the end of their functional life. Objectives Renew the three outdoor play areas to provide safe, inclusive, and engaging outdoor environments for children Create simple, flexible and nature-based environments that support a broad range of educator-led learning experiences, child-led play and everyday programming Increase opportunities for exploration, creativity, social interaction and connection with nature through landscaping, planting, natural materials and open-ended play opportunities Improve accessibility, supervision, functionality, and compliance with relevant standards and operational requirements and maintenance needs Deliver a durable, low-maintenance landscape-led outcome that provides long-term value and can evolve over time without reliance on large or highly manufactured play equipment Scope Based on the Council endorsed Concept Design, the Contractor will prepare design contract documentation and deliver project construction services for three outdoor learning areas at Brine Street Early Learning Centre at 31-33 Brine Street, Hughesdale. The scope includes: Developing the attached Concept Design into a Detailed Design ready for construction Delivery of the physical works, including all investigations, design development, documentation, approvals and specialist input Engaging relevant disciplines as required, including Landscape Architecture, Geotechnical Engineering, Playspace Safety Auditor, Arboriculture, and other specialist consultants as required Project Stages Stage 1, Detailed Design: develop the endorsed Concept Design into construction-ready drawings, draft specifications, a playspace safety audit and a budget review Stage 3, Final Design Documentation: complete construction drawings, final specifications and structural certification where applicable (the brief has no Stage 2) Stage 4, Construction Phase Services: construction in three sequential stages, one per playspace, while the centre remains operational, with as-built drawings, warranties and manuals at completion Site Constraints A tree survey of 24 trees (Evergreen Tree Consulting), with retention and TPZ/SRZ protection where practicable A Preliminary Site Investigation (DRC Environmental) found the site is not potentially contaminated Contract Terms and Conditions This is a fixed lump sum contract Tender Briefing A mandatory pre-tender meeting will be held for this opportunity. Date: 19 November Time: 10:00am Location: Brine Street Childcare, 31-33 Brine Street, Hughesdale Attendance: Mandatory
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 2 days23 November 2026, 02:00 PM Australia/Melbourne
Roy Dore Outdoor Gym Upgrade- D&C
- Submission deadline: 25 November 2026, 02:00 PM Australia/Melbourne
Huntingdale Road Streetscape Upgrade, Phase 1 - Concept Design
- Submission deadline: 25 November 2026, 02:00 PM Australia/Melbourne
Traffic Management Services
- Submission deadline: 25 November 2026, 03:00 PM Australia/Melbourne
Yea Flora Fossil Site - Heritage Management Plan - 2026-2027
- Submission deadline: 26 November 2026, 02:00 PM Australia/Melbourne
Ken Harrison Reserve - Irrigation Upgrade Works
- Submission deadline: 26 November 2026, 02:00 PM Australia/Melbourne
Hepburn Shire Council Building Condition Survey
