Church Street SPS Rising Main Relocation

Advance notice — not yet open for submissionsExpected tender release: 30 October 2026 — indicative and subject to change

About this advance notice

Overview East Gippsland Water (EGW) plans to release an open, single-stage Invitation to Tender (ITT) in late October 2026 for the Church Street Sewage Pumping Station (SPS) Rising Main Relocation in Lakes Entrance, Victoria. This is an Advance Tender Notice only. About The downstream discharge manhole associated with this works has already been rehabilitated. The sewage pumping station itself will remain unchanged, as it is operational and fit for purpose. Scope The proposed works involve replacing the failed asbestos cement rising main with a corrosion-resistant PE100/PE100-RC pipeline along the existing alignment. The scope includes: Approximately 218.7 metres of new rising main New fittings, bends and connections to the existing SPS storage and downstream discharge manhole Temporary bypass pumping during construction Instructions to Tenderers Tender documents are not yet available, and the proposed scope and release timing may change. Full requirements will be provided when the ITT is released.

How to prepare for this planned opportunity

This is an advance notice and is not yet open for submissions. Use the lead time to prepare without assuming the final request or deadline.

Review the advance notice

Read the buyer’s planned scope and note that the release estimate is indicative and may change.

Check your capacity

Consider delivery capacity, geographic coverage and likely partner requirements ahead of release.

Prepare capability material

Collect relevant project examples, outcomes and credentials that may support a future response.

Recheck when released

Wait for a verified opening, then review the published requirements and submission deadline before deciding to respond.

Prepare before this opportunity is released

Build your capability material now, then review the request when it opens.

Sign up