Eynesbury Estate 4.8 ML Welded Steel Drinking Water Tank

Advance notice — not yet open for submissionsExpected tender release: 11 November 2026 — indicative and subject to change

About this advance notice

Overview CMP Consulting Group Pty Ltd, in conjunction with Greater Western Water, is intending to release a Request for Tender in November 2026 for the 4.8 ML Welded Steel Drinking Water Tank, Green Hill, Eynesbury Estate. Scope The scope includes: Design and construction of a new 4.8 ML welded steel drinking water storage tank (approximately 36 m diameter) adjacent to the existing 1.4 ML tank at the Green Hill tank site, Eynesbury Estate Installation of inlet/outlet pipework with tie-ins to existing mains Installation of valving Associated electrical works, including a new switchboard and metering panel The works are for Resimax Group, within the City of Wyndham. Contractor Requirements The head contractor must be accredited with Greater Western Water for the supply of works and services in Category WC2 (Distribution Water Mains > DN280) Tank construction must be undertaken by a Greater Western Water WC8 (Storage Structures) accredited tank builder

How to prepare for this planned opportunity

This is an advance notice and is not yet open for submissions. Use the lead time to prepare without assuming the final request or deadline.

Review the advance notice

Read the buyer’s planned scope and note that the release estimate is indicative and may change.

Check your capacity

Consider delivery capacity, geographic coverage and likely partner requirements ahead of release.

Prepare capability material

Collect relevant project examples, outcomes and credentials that may support a future response.

Recheck when released

Wait for a verified opening, then review the published requirements and submission deadline before deciding to respond.

Prepare before this opportunity is released

Build your capability material now, then review the request when it opens.

Sign up