VEMTC Bangholme Training Campus - Construction of New Change Building

Closes in 3 daysClose date: 3 September 2026

About this tender

Overview The Country Fire Authority (CFA) is tendering this project and plans to release an Open Tender for the construction of a new change building at the existing Victorian Emergency Management Training Centre (VEMTC), Bangholme Campus. Scope The scope includes: Construction of a new change building covering 405m2, consisting of 14 showers, 14 change cubicles, a transition area with PPC store (clean and dirty), a drying room, a staff locker room, a laundry, amenities and other associated rooms and joinery External works including a boot and hand wash point, amenities and adjoining landscaping Building works including services connections, concrete ground slab, timber framed walls and roof system, colorbond cladding and roof sheeting, roller doors, aluminium doors and windows, and internal walls Vinyl wall and floor lining throughout Contractor Requirements Compliance with Occupational Health and Safety requirements Compliance with Industrial Relations Management requirements Compliance with applicable government policies affecting the procurement, including the Directions and Instructions for Public Construction Procurement Instructions to Tenderers Refer to the following preliminary design drawings: Bangholme Change SK 01P14 Site Plan Bangholme Change SK 02P14 Floor Plan Bangholme Change SK 03P14 Roof Plan & Elevations

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up