Albany Artificial Fishing Reef
Tender Overview
About this tender
Scope: The Contractor must make its own arrangements for the design, construction and removal of any temporary works as are necessary to carry out the Contract. Temporary works would be dependent on the Contractor’s methodology and may include: • establishment of the Storage site and Load-out site and the provision of all required services including but not limited to: Concept design, Method Statement and Program of Works Obtain approvals for the temporary works or other approval authority as required Environmental Management Plan • provision of moorings for vessels; and • any other works used in execution of the Works under the Contract but not forming part of the Works. The cost of providing temporary works including design, construction and removal at completion of the Contract shall be deemed to be included in the Contract Sum for the Works. Specification and Supply of Concrete Concrete Structures Formwork for Concrete Steel Reinforcing Materials Structural Steel Welding - Welding of Reinforcing Steels Prefabricated Concrete Elements General Purpose and Blended Cements Aggregates for Concrete Stainless Steel Structures Occupational Noise Management Safety Signs for the Occupational Environment Measurement of Occupational Health and Safety Acoustics Measurement of airborne noise emitted by vessels in waterways, ports and harbours.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
