Burswood Park Board - Burswood Park Foreshore - Stabilisation Stage 2 Zone B

Closes in 29 daysSubmission deadline: 22 October 2026, 02:30 PM Australia/Perth

About this tender

Overview The Department of Housing and Works (WA), on behalf of the Burswood Park Board, is seeking a contractor to undertake Stage 2, Zone B of the Burswood Park Foreshore Stabilisation Project. About The project was initiated to stabilise the foreshore using bioengineering techniques and rock toes, and to improve the biodiversity and amenity of the site. This request relates to the second stage of works along the Burswood Park Foreshore Stabilisation Project. Scope The works shall include the provision of all materials, labour, equipment and cartage as indicated on the drawings and as necessary for the due and proper completion of the works, comprising but not limited to the following: Site preparation and set out, vegetation and fauna management, and surface water and sediment management Clearance, tree and shrub removal and salvaging Nursery coordination and plant quality control Preliminary weed control and ongoing weed management during works activities Earthworks limited to filling, embankment regrading to specified areas and levels, following topsoil reuse and fine grading Management of debris, unconsolidated organic matter, sediments, silts, acid sulphate soils and contaminated soils associated with historic landfill activities in accordance with the Construction and Environmental Management Plan (CEMP) Supply and installation of bioengineering structures and rockwork Location and reconfiguration of existing irrigation, including partial demolition and supply and installation of new laterals and fittings Supply and installation of mowing edging (concrete) Supply and installation of fencing Supply and installation of mulching Installation of planting and advanced trees supplied by the contractor Making good the site and clean up Consolidation maintenance Ongoing long-term maintenance (post Final Completion) in accordance with the Long-Term Maintenance Plan (Syrinx 2026) Plant procurement is excluded from the scope, as this will be undertaken by the client to ensure numbers and species are available at the time of implementation. Nursery coordination regarding delivery times remains the responsibility of the contractor. Site Inspection Date: 8 October 2026 Time: 10:00 AM Location: Burswood Foreshore, Roger Mackay Road, Foreshore Path, Burswood Respondents are requested to confirm their attendance at the briefing no later than 2pm on 29 September 2026 by contacting stefanie.quinn@dohw.wa.gov.au.

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up