ME093 Dewatering Pipe - Havieron Project - Brownfields Gold-Copper Development
Tender Overview
About this tender
Overview Greatland Pty Limited requires a suitably qualified vendor to manufacture and supply carbon steel pipes lined with HDPE for the underground dewatering network at the Havieron mine site, as part of the Havieron Project brownfields gold-copper development. Scope The package comprises piping anticipated to be as follows: DN200 Sch80 carbon steel pipe with CL300 flanges and 8mm internal HDPE lining Nominally 6m lengths, with a number of shorter variations required Total pipe length required for this project is in the vicinity of 2km Non-standard elbows and bends of varying radius and leg lengths Fittings, comprising non-standard tees, reducing spools, branch connections and special spools External protective barrier coating, with the paint system to be determined The scope of work is for the all-encompassing supply of pipe and fittings in accordance with issued engineering drawings and specifications, including provision for all labour, supervision, plant, equipment, consumables, QA/QC, testing, Manufacturers Data Record (MDR), and delivery to the Havieron mine site. Enquiries All initial enquiries should be made through the Industry Capability Network Western Australia. Contact: Hengameh Kiani Email: h.kiani@icnwa.org.au Phone: (08) 9365 7543
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
