Open government and public tenders
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
The Commonwealth of Australia has been awarded the Strategic Shipbuilding Agreement pursuant to the development of a Sovereign, Continuous Naval Shipbuilding and Sustainment capability. Under this agreement, a Tasking Statement has been issued for the build of the Damen designed Landing Craft – Heavy, which will be the largest military vessel built in Western Australia to date and will require a collaborative effort from Australian and New Zealand industry. To this end, a competitive demonstration of manufacturing capability is sought from appropriately skilled and resourced suppliers, in accordance with the hull sub-assembly specification. It is anticipated that this EOI will be used to develop a shortlist of suppliers to be invited to participate in the capability demonstration, which will include building the specified sub-assembly for assessment. Assessment criteria and weightings are provided in the specification. Scope Overview Austal Defence Shipbuilding Australia is seeking Expressions of Interest from suitably qualified Australian suppliers with demonstrated capability in marine pipe spool fabrication, installation, testing, flushing, and preservation coordination for large, complex naval vessel construction programs. This scope covers fabrication capability and/or coordination and management of external fabrication, together with shipboard installation and system completion. Materials may include, but are not limited to, carbon steel, stainless steel, copper-nickel (CuNi), and glass-reinforced epoxy (GRE) piping systems. Indicative Scope of Work The indicative scope may include, but is not limited to, the following activities: 1. Supply of Materials The Contractor may be responsible for the supply, management, and delivery of materials, including: • Fittings, flanges, valves, fasteners and gaskets. • Materials manufactured from approved piping materials (e.g. carbon steel, stainless steel, CuNi, GRE) • Consumables including welding consumables, bonding agents, resins, purge gases, cleaning agents and preservation materials, as applicable. • Materials to be sourced, stored, handled, and controlled in accordance with project specifications and material-specific requirements 2. Pipe Spool Fabrication Scope may include pipe spool fabrication undertaken either in-house or via coordinated external facilities including: • Fabrication of pipe spools in accordance with drawings, isometrics and specifications. • Cutting, forming, fit-up, and joining using material-appropriate processes (e.g. welding, mechanical joining or bonding) • Material identification, segregation, and traceability throughout fabrication. • Dimensional control and verification to ensure readiness for installation within unit and block assemblies. • Coordination, supervision and quality oversight of third-party fabrication where applicable 3. Pipe Installation Scope may include shipboard pipe installation activities, including: • Installation or supply of fabricated spools at unit, block or consolidated hull stage • Installation and torquing of flanged or mechanical joints where applicable. • Installation of pipe supports, restraints, and expansion provisions appropriate to the piping material. • Coordination with structural, mechanical, electrical, and outfit works to maintain access and tolerances. Installation activities shall be aligned to Austal installation philosophies and production work packages. 4. Testing and Inspection Scope may include testing and verification activities appropriate to the piping system and material including: • Preparation and support of system testing activities (e.g. pressure testing or equivalent). • Leak testing and joint integrity checks. • Rectification of defects or non-conformances identified during testing. • Support to inspections conducted by Austal, the Commonwealth and/or Classification Society. 5. Flushing and Cleaning Scope may include system flushing and internal cleanliness activities including: • Pre-flush preparation and isolation of systems. • Flushing using approved medium and processes appropriate to the system and material. • Completion flushing to specified cleanliness standards. • Coordination with testing, preservation and system handover activities. 6. Paint and Preservation Coordination Scope may include coordination of coating, painting, and preservation including: • Coordination with painting subcontractors or shipyard teams for coated systems. • Temporary and long-term preservation of piping systems during construction. • Protection of completed systems from damage, contamination or degradation. 7. Production & Yard Interface The Contractor will be required to: • Execute works in accordance with Austal installation philosophies, drawings and production sequencing. • Support early-stage fabrication and installation aligned to unit or block construction. • Complete installation, testing, flushing, and system closure following block consolidation. • Comply with shipyard safety, quality and permit systems
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.