Provision of Warehouse Drafting Services
Tender Overview
About this tender
Overview The Western Australian Electoral Commission (WAEC) is seeking offers for professional drafting and documentation services to support its proposed warehouse facility fit-out. Scope The scope includes: Provision of professional drafting and documentation services to support the proposed WAEC warehouse facility fit-out Translation of WAEC's operational, security, storage and workflow requirements into a coordinated and construction-ready set of drawings and documentation Preparation of documentation suitable for WAEC approval, landlord pricing, procurement and construction purposes Enquiries Enquiries contact: Alexia Botha, Phone (08) 0451775912, Email Alexia.Botha@waec.wa.gov.au Contractual contact: Donato Lombardi, Facilities & Assets Manager, Email Donato.Lombardi@waec.wa.gov.au
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 2 days06 November 2026, 05:00 PM Australia/Perth
Rehoboth Christian College Gibbs Park Stage 1 School Building
- Closes in 2 days06 November 2026, 05:00 PM Australia/Perth
Geotechnical Assessments (Cue & Peak Hill)
- Submission deadline: 10 November 2026, 02:00 PM Australia/Perth
Design Consultancy – James Street Enhancement (William St to Fitzgerald St)
- Submission deadline: 11 November 2026
Automated Guided Vehicles (AGV) and Autonomous Mobile Robots (AMR) - New Women and Babies Hospital
- Submission deadline: 12 November 2026
HI-MULM-0121 Construction Water Network Design and Construct - Mulga Downs Iron Ore Project
- Submission deadline: 12 November 2026
HI-MULM-0015 Bulk Earthworks Design - Mulga Downs Iron Ore Project
