Remedial and Upgrade Works at Five (5) Discharge Measurement Structures in the South Coast and South West

Closes in 7 daysSubmission deadline: 01 December 2026, 02:30 PM Australia/Perth

About this tender

Overview The Department of Water and Environmental Regulation (DWER) is seeking to engage a suitably qualified and experienced civil construction contractor to undertake discharge measurement structure (DMS) repair works at five locations across the South West and South Coast regions of Western Australia. About The Works Under Construction are subject to the Principal reviewing and revising the project plan and securing all necessary authorisations prior to commencement. The Principal reserves the right at any time during the Term to vary, expand or reduce the scope of Works, and will liaise with the Contractor on the project plan, Site access and sequencing of works. The exact location will be based on permits, land access and geological considerations, and will be directed by the Principal's Representative on Site. Scope The scope includes: Remedial works and upgrades to five discharge measurement structures across the nominated Sites, undertaken in the following order: Lort River, Fairfield (Site 601004); Preston River, Boyanup Bridge (Site 611004); Pollard Brook Tributary, Lemon Catchment (Site 612009); Clarke Brook, Hillview Farm (Site 613146); and Bingham River, Palmer (Site 612014) All items of work set out in the Contract documents, attachments and construction drawings (where available), and all other work necessarily incidental to the proper completion of the works Taking before and after photographs of each Site, labelled with the Site name and date and time stamped Compliance with the attached Environmental Management Plan (EMP) in undertaking the works, including completion of a daily Environmental Checklist located in the EMP document Contractor Requirements Suitably qualified and experienced civil construction contractor Contract Terms and Conditions Works on Site are anticipated to commence in January 2027 Works are anticipated to be completed prior to the end of April 2027 The Principal reserves the right at any time during the Term to vary, expand or reduce the scope of Works Site Inspection A site visit will be held at Preston River, Boyanup, Boyanup on 19 November 2026 at 10:00 AM. Respondents are requested to confirm their intention to attend by no later than 2:00 PM, Western Australia, Wednesday 18 November 2026, by emailing Tom Hunter at tom.hunter@dwer.wa.gov.au

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.