SOW-043-G-12071/A Fuel Farm Construction - Western Ridge Project
Tender Overview
About this tender
Overview BHP Billiton Iron Ore Pty Ltd (WA) intends to construct, install and commission a 200 kL In-Pit Fuel Storage Facility, known as the Western Ridge (WR) Fuel Facility, as part of the Western Ridge Project. The facility must meet the requirements described in the Statement of Work and comply with applicable Australian Standards and BHP standards. About The WR Fuel Facility will integrate unused equipment purchased under a legacy project for OB25 that was later cancelled. At a high level, the legacy equipment comprises a 200 kL self-bunded fuel tank and some unloading and dispensing equipment, including selected pumps. A condition assessment has confirmed that the existing equipment is suitable for installation. Scope The scope includes: Construction, installation and commissioning of the 200 kL In-Pit Fuel Storage Facility (Western Ridge Fuel Facility) Delivery of the facility using a cost-effective modular design that reduces site works where possible and enables efficient construction of a fully functional fuel facility Integration of the existing legacy equipment, comprising the 200 kL self-bunded fuel tank and associated unloading and dispensing equipment, including selected pumps Maintaining operational flexibility to allow the equipment to be relocated as the Western Ridge mining area develops
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.