Waggon Creek-1 and Vienta-1 Gas Well Plug and Abandonment

Advance notice — not yet open for submissionsExpected tender release: 24 December 2026 — indicative and subject to change

About this advance notice

Overview The Department of Mines, Petroleum and Exploration (DMPE), through its Abandoned Mines Program, is seeking a Lead Contractor to carry out the permanent plug and abandonment of the Waggon Creek-1 and Vienta-1 gas wells. About Waggon Creek-1 (drilled 1995) and Vienta-1 (drilled 1998) are orphaned gas wells located in petroleum exploration permit EP 386 in the onshore Bonaparte Basin, Western Australia. Both wells are shut in at the production tree and no titleholder remains responsible for them. Objectives The objective of the Works is the permanent abandonment of both wells in a manner compliant with industry standards, so that their long-term integrity is assured. Permanent barriers are to be installed across the caprock to reinstate the seal broken when each well was drilled (caprock restoration), with two independent permanent barrier envelopes provided for redundancy, within the framework of ISO 16530-1 and the OEUK guidelines. Scope The scope includes: Permanent plug and abandonment works on the Waggon Creek-1 gas well Permanent plug and abandonment works on the Vienta-1 gas well Installation of permanent barriers across the caprock to restore the seal at each well Provision of two independent permanent barrier envelopes for redundancy at each well

How to prepare for this planned opportunity

This is an advance notice and is not yet open for submissions. Use the lead time to prepare without assuming the final request or deadline.

Review the advance notice

Read the buyer’s planned scope and note that the release estimate is indicative and may change.

Check your capacity

Consider delivery capacity, geographic coverage and likely partner requirements ahead of release.

Prepare capability material

Collect relevant project examples, outcomes and credentials that may support a future response.

Recheck when released

Wait for a verified opening, then review the published requirements and submission deadline before deciding to respond.

Prepare before this opportunity is released

Build your capability material now, then review the request when it opens.

Sign up