All capabilities not specified elsewhere - Abercrombie Wind Farm Project

Closes in 2355 daysClose date: 31 December 2032

Tender Overview

618010
Issued by Vestas Development Australia Pty Ltd
New South Wales : Murray : Riverina
Engineering & Research & Technical Based Services : Engineering Consulting Services : Project Management Power Generation & Transmission & Distribution : Photovoltaic Systems : Power Generation Systems : Power Transmission Line Construction

About this tender

Vestas, one of the most experienced wind energy providers globally, is developing the Project. Vestas is a global leader in sustainable energy solutions. Vestas designs, manufactures, installs and services wind turbines around the world. Vestas has delivered more than 200,000 MW or about 91,000 wind turbines in 88 countries, which accounts for almost 20 per cent of the total worldwide installed capacity. Vestas Australia has constructed and operates more than 2,200 wind turbines across 60 wind farms in Australia. With more than 30 years' experience, Vestas Australia has a 8 GW portfolio (including projects under construction), over 1 GW of which is installed in NSW. Vestas employs more than 800 people across Australia and New Zealand, prioritising local expertise, and reliable long-term service for our projects. Abercrombie Wind Farm Abercrombie Wind Farm is being developed in the South West Renewable Energy Zone (SW REZ), 40 km southwest of Hay, NSW, in the Hay and Edward River Local Government Areas. The region southwest of Hay has several outstanding features that make it one of the most suitable locations for wind energy development in New South Wales. The site has demonstrated consistently high wind speeds, making it one of the strongest wind resources in NSW. Its predominantly flat terrain supports efficient construction and lower civil costs. The surrounding grazing land is highly compatible with wind farm operations, allowing agricultural activities to continue with minimal disruption due to the project's small footprint. Additionally, the area's low-density rural setting helps minimise impacts on local community amenity. The project will consist of up to 348 Vestas wind turbines, generating up to 2.5 gigawatts of low-cost renewable energy. Vestas will design, supply, construct and maintain the proposed wind farm for the life of the Project. Project timeline In 2024, DPHI issued the Secretary's Environmental Assessment Requirements (SEARs), setting the framework for the preparation of the project's Environmental Impact Statement (EIS). To meet these requirements, Vestas is undertaking detailed studies to assess potential environmental impacts and benefits, including independent visual, noise and ecological assessments of the proposed wind turbines. Construction is currently targeted to commence in 2028. Workforce opportunities If approved, the Abercrombie Wind Farm will create up to 600 new jobs during construction and up to 40 long-term service and maintenance jobs during operations. Construction and operation will require a range of skills such as engineering, trade, project management and transport. Operational roles are expected to be based permanently in the the Hay Shire and Edward River regions. Vestas is committed to ensuring strong local employment and economic benefit from the project. All capabilities not specified elsewhere

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up