Darwin Region - Urban Roads - Bituminous Pavement Repairs for a Period of 36 Months
Tender Overview
About this advance notice
Overview The Department of Logistics and Infrastructure (NT) is seeking a contractor to undertake bituminous pavement repairs on urban roads in the Darwin region for a period of 36 months. Scope The scope includes: Bituminous repairs and minor rehabilitation of existing roads, car parks, cycleways and footpaths Provision of seasonal road inspections to log pothole and delamination defects within prescribed intervention levels on all road assets, excluding pathways Repair of pothole and delamination defects following automatic approval Repair of pothole and delamination defects within nominated response times on all assets, in accordance with performance based requirements Edge break repairs, as ordered by DIPL through the CSR system Regulation patching, as ordered by DIPL through the CSR system Reconstruction patching, as ordered by DIPL through the CSR system Spray sealing using hot bitumen, as ordered by DIPL through the CSR system Minor reconstruction with surface works, as ordered by DIPL through the CSR system Contract Terms and Conditions Contract period of 36 months Estimated price range of $10M to $20M Enquiries Technical enquiries: 08 8999 1934 (if outside Australia call +61 8 8999 1934) Project officer, Sugam Suwal: 08 8949 3492 (if outside Australia call +61 8 8949 3492)
How to prepare for this planned opportunity
This is an advance notice and is not yet open for submissions. Use the lead time to prepare without assuming the final request or deadline.
Review the advance notice
Read the buyer’s planned scope and note that the release estimate is indicative and may change.
Check your capacity
Consider delivery capacity, geographic coverage and likely partner requirements ahead of release.
Prepare capability material
Collect relevant project examples, outcomes and credentials that may support a future response.
Recheck when released
Wait for a verified opening, then review the published requirements and submission deadline before deciding to respond.
