Katherine BESS Civil Works
Tender Overview
About this tender
Overview Territory Generation is installing a 21MVA BESS (Battery Energy Storage System) at Katherine Power Station to reduce reliance on existing generation assets for the provision of Essential System Services. This tender seeks to identify and engage a suitably qualified and experienced civil contractor to complete the required bulk earthworks. Scope The scope includes: Completion of bulk earthworks within the Katherine Power Station footprint Sourcing of considerable volumes of appropriate material Specific placement and compaction of material Contractor Requirements Suitably qualified and experienced civil contractor Enquiries Technical enquiries: call 08 8999 1934 (if outside Australia call +61 8 8999 1934) Project officer: Andrew Jones, 0400 177 958 (if outside Australia call +61 400 177 958)
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.