Overview KGL Resources Limited is progressing the Jervois Copper Project, a copper, silver and gold project located in Central Australia in the Northern Territory. This listing is a "Keep me Updated" registration of interest for businesses seeking future opportunities associated with the project. About The Jervois Copper Project is located on existing mineral leases approximately 380 km by road east-north-east of Alice Springs, and is accessed via the Plenty Highway. Jervois has a Mineral Resource Estimate of 27.45 Mt at 1.87% Cu, 25.3 g/t Ag and 0.24 g/t Au, representing approximately 513.4 kt Cu, 22.37 Moz Ag and 214.5 koz Au. The Mineral Resource includes open cut and underground components, and the current development case is based on a 10 year mine life. Open cut mining is planned at Reward and Bellbird, with underground mining planned at Reward, Rockface, Bellbird and Marshall. The current mine sequence includes 5.98 Mt at 1.27% Cu from Reward open cut, 2.82 Mt at 1.47% Cu from Bellbird open cut, 3.16 Mt at 1.86% Cu from Reward underground, 3.35 Mt at 2.53% Cu from Rockface underground, 1.38 Mt at 1.59% Cu from Bellbird underground and 1.83 Mt at 1.19% Cu from Marshall underground. The project includes an on-site processing plant with a design capacity of 2 Mtpa, using conventional crushing, grinding, flotation and thickening to produce a single copper concentrate. Over the life of mine, Jervois is expected to produce approximately 1.07 Mt dmt of copper concentrate, containing approximately 276.8 kt Cu, 10.541 Moz Ag and 87.0 koz Au. The estimated concentrate grade is 26% Cu, 307 g/t Ag and 2.53 g/t Au. Project infrastructure includes site preparation, civil works, roads and pads, construction camp accommodation, water supply, environmental bonding, a 2 Mtpa concentrator, borefield and water supply system, 10 MW power generation, 250 accommodation units, an airstrip, tailings storage facility and supporting mine infrastructure and buildings. Later project infrastructure may include underground infrastructure, tailings storage facility capacity increases and general sustaining capital works. The current project delivery schedule includes commissioning and ramp-up during H1 2028, with steady-state throughput capacity from H2 2028. Purpose Businesses interested in future opportunities associated with the Jervois Copper Project should register their interest through the 'Keep me Updated' package to be considered for future opportunities as they arise. How to Apply Businesses should register their interest through the 'Keep me Updated' package and ensure their company profile includes relevant capability, capacity, locations, licences, certifications, previous project experience and key partner/client details.
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.