Duvauchelle Water Supply Treatment Plant
Tender Overview
About this tender
Overview Christchurch City Council is inviting Tenderers to submit tenders for the upgrade of the Kaitouna Duvauchelle Water Supply Treatment Plant. About The existing Duvauchelle Water Treatment Plant (WTP) utilises conventional media and cartridge filtration technology and does not consistently comply with the Drinking Water Standards for New Zealand. During high turbidity events, water must be brought by tanker from elsewhere to meet demand, at a significant cost. Purpose The purpose of the project is to upgrade the existing water supply treatment plant to ensure that Council provides a facility that meets the following outcomes. Objectives Produces drinking water in accordance with the New Zealand Drinking Water Regulatory Framework Utilises membrane filtration to provide a minimum 4 log protozoa credit Has low total lifecycle costs, including by minimising energy use and chemical use Provides fully automated plant operation, with a high level of reliability, to minimise operational interventions and maintenance requirements and associated costs Has conforming electrical, instrument and controls system design and operation, including SCADA interface and telemetry system Scope The scope includes: Construction of the new treatment plant on the site of the existing treatment plant Maintaining the site as an operational water treatment plant in continuous service throughout the Contract
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.