Springston Rolleston Road and Selwyn Road Roundabout
Tender Overview
About this tender
Overview This tender is for the construction of a new single-lane roundabout at the intersection of Selwyn Road and Springston Rolleston Road, including the provision of shared path connections and associated infrastructure works. Purpose The project is intended to improve the safety, efficiency, and accessibility of this key transport corridor while supporting current and future growth within the surrounding communities. About The intersection is located at the southern extent of the Rolleston urban area and forms part of an important transport link between the growing townships of Rolleston to the north and Lincoln to the south. Springston Rolleston Road currently operates as the priority route through the intersection and experiences significant commuter traffic volumes. The surrounding land uses present a range of stakeholder and interface considerations, including the Selwyn Road Sewer Pump Station within the south-western quadrant, school land to the north-west, residential properties to the north-east, and rural pastoral land to the south-east. Scope The scope includes, but is not limited to: Earthworks and pavement construction associated with the new roundabout and approach roads Construction of stormwater infrastructure Piping and reinstatement of existing stockwater races Liaison and coordination with utility providers, including protection, modification, and installation of services as required Construction of carriageways, kerbs and channels Construction of shared pathways, cycle facilities, footpaths, and vehicle crossings Construction of splitter islands, traffic islands, and associated traffic restraint features Installation of road markings and traffic signage Landscaping works including garden beds, planting areas, specimen trees, shrubs, grasses, groundcovers, mulching, and tree staking Traffic management, erosion and sediment control, noise management, survey set-out, and associated temporary works Maintenance of all landscaped and grassed areas for a period of 24 months following Practical Completion All ancillary works necessary to deliver a fully completed and operational project in accordance with the contract documentation Coordination of street lighting installation by Connetics, including integration of these works within the overall construction programme and management of associated construction interfaces
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 1 day20 October 2026, 12:00 PM Pacific/Auckland
AgHort A Research Lab Refurbishment
- Closes in 1 day20 October 2026, 05:00 PM Pacific/Auckland
Main Contractor for 4: Toilet Refurbishment at Bayview School
- Closes in 2 days21 October 2026, 12:00 PM Pacific/Auckland
RFP - Northland Trades Services Panel for Locksmith Projects and Maintenance Services
- Closes in 2 days21 October 2026, 04:00 PM Pacific/Auckland
Murray Street Sewer Upgrade
- Closes in 2 days21 October 2026, 04:00 PM Pacific/Auckland
Murphy Park Redevelopment
- Closes in 2 days21 October 2026, 05:00 PM Pacific/Auckland
Main Contractor for Block A Hall High Level Roof Replacement at James Hargest College