Survey - Calvale to Calliope River Transmission Line Reinforcement Project
Tender Overview
About this tender
Overview Powerlink Queensland, through CPP, is inviting Expressions of Interest (EOI) from registered surveyors to provide construction survey support across the works for the Calvale to Calliope River Transmission Line Reinforcement Project. Scope The scope includes: Establishing and maintaining survey control Surface modelling Set-out Conformance checks As-built surveys Reporting Survey is to be carried out to GDA2020 / MGA2020 and AHD standards. Contractor Requirements Survey work must be carried out under a registered or licensed surveyor in line with Powerlink specifications
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 2 days23 November 2026, 05:00 PM Australia/Brisbane
Expression of Interest - 61-73 MacArthur Street, Alexandra Hills
- Closes in 3 days24 November 2026, 05:00 PM Australia/Brisbane
Assessment of Central Highlands Regional Council Washdown Facilities
- Submission deadline: 25 November 2026, 02:00 PM Australia/Brisbane
Bowen Landfill – Cell 2 – Construction Quality Assurance (CQA) Consultancy
- Submission deadline: 25 November 2026, 05:00 PM Australia/Brisbane
Peregian Beach Playground – Design and Construct
- Submission deadline: 26 November 2026, 11:00 AM Australia/Brisbane
HB Water Main Replacements - Package 1 26/27 - Construction Works
- Submission deadline: 27 November 2026, 11:00 AM Australia/Brisbane
Water Reservoirs - Boys Ave and Takura Roof Replacements - Design and Construct
