Growth Enabling NPI Program - Construction Delivery Capability - Copper SA Growth Enabling NPI Program: Construction Delivery Capability

Open for submissionsSubmission deadline: 04 December 2026

About this tender

Overview BHP Olympic Dam Corporation Pty Ltd (BHP) is seeking expressions of interest from suitably qualified contractors and contractor teams with capability and availability to support the Copper SA Growth Enabling Non-Process Infrastructure (NPI) Program at Olympic Dam. About In 2025, BHP conducted the CuSA Trade Contractor EOI to understand construction contractor capability, capacity, employee relations and delivery experience across the broader Major Projects Copper SA portfolio. This EOI is a separate, local asset project-specific market engagement seeking current information on the Growth Enabling NPI projects. Purpose The EOI is intended to seek market capability across construction contractors (Construct Only, Design and Construct (D&C), and Engineering, Procurement and Construction (EPC) delivery models) before BHP determines the contracting and packaging strategy for each project. This is an early market-sounding activity only, intended to help BHP begin shaping delivery model strategies across the Growth Enabling NPI Program. Scope The program comprises a portfolio of enabling infrastructure projects supporting Copper SA growth. The projects remain discrete investments and may progress under different schedules, packaging strategies and delivery models. Current project areas are: Accommodation Expansion of the existing ODS Village to provide accommodation for additional workforce requirements Earthworks and stormwater management Installation of the accommodation buildings and other central facilities On and off plot utilities, including HV/LV power supply, potable water and wastewater Technology, other operationally required services and supporting infrastructure BHP is interested in both supply-led and integrated D&C capability for this project, together with construct-only capability where design or major supply packages are provided separately. SMA Switchyard / SPARK Installation of new 132kV switchgear at an existing switchyard (brownfield) Construction of a new 132kV overhead powerline from the existing switchyard to a new switchyard in a new mining area (brownfield/greenfield) Construction of a new switchyard at the new mining area, comprising 132kV, 33kV and 11kV infrastructure (greenfield) Construction of 33kV overhead power lines (four circuits) within the new mining area, as well as some 11kV overhead power lines (largely greenfield and re-purposing of existing stranded equipment) Transitional Water Installation of a rental temporary desalination plant Drilling and construction of 10-15 borehole sites across the Southern Mine Lease (SML), with boreholes up to 300m deep drilled by a specialist contractor and above ground headworks at each site Installation of above ground and below ground piping connecting the headworks to a common transfer main Installation of the transfer main to the desalination plant Addition of dewatering storage and hardstands at each borehole site Northern Water Integration Integration of the Northern Water supply into existing site networks, including pipelines, pumping, storage, tie-ins, controls and associated infrastructure Airport Targeted airport airside upgrades to support increased passenger demands and operational requirements Reactive Power Reactive power compensation and associated electrical infrastructure, integration, controls, protection, testing and commissioning (scope and packaging remain under development) Contractor Requirements Suitably qualified contractors or contractor teams with capability and availability to support the Growth Enabling NPI Program Capability across Construct Only, Design and Construct (D&C), and Engineering, Procurement and Construction (EPC) delivery models Provision of information on capability, relevant experience, delivery model appetite, capacity and availability Instructions to Tenderers This is an early market-sounding activity only. Physical construction on some of the packages listed is not expected to start until 2028. Respondents are asked to provide information on their capability, relevant experience, delivery model appetite, capacity and availability. Pricing, rates, estimates or commercial offers should not be provided at this stage.

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.