Unsolicited EOI - Goyder Renewable Zone - Goyder North Wind Farm Project
Tender Overview
About this tender
Overview Neoen Australia Pty. Ltd. is inviting unsolicited expressions of interest for opportunities that may arise on the Goyder North Wind Farm project, part of the Goyder Renewable Energy Zone (Goyder REZ) in South Australia's Mid North region. About Goyder North received Planning Consent for up to 135 wind turbines, equivalent to approximately 1,000 MW of wind power, and three standalone big batteries with a total storage capacity of up to 900 MW / 3,600 MWh. The project has since been refined and is progressing as follows: Goyder North Wind Farm, to be built in one or two stages of up to 99 turbines, with the first stage comprising at least 300 MW, expected to commence construction in H2 2026 The first standalone big battery, Goyder Battery, with a minimum capacity of 200 MW / 800 MWh, located adjacent to ElectraNet's Bundey Substation, expected to commence construction in mid-2026 Neoen Australia is progressing development of the Goyder North Wind Farm, a large-scale renewable energy project located near Burra in South Australia's Mid-North region. Neoen is a global independent power producer headquartered in Paris, with more than 8 GW of renewable energy in operation or under construction worldwide, and a strongly established presence in Australia since 2012. The company develops, owns and operates utility-scale wind, solar and battery storage assets, and is recognised for delivering landmark projects such as the Hornsdale Power Reserve, Kaban Green Power Hub and the Blyth Battery Energy Storage System. The Goyder North Wind Farm represents the next phase of Neoen's long-term investment in South Australia and forms part of the broader Goyder REZ, which has been progressively developed since 2019. The project is situated approximately 15-25 km north-east of Burra, in a regional and sparsely populated agricultural landscape characterised by open pastoral land and ridgelines with strong wind resources. The site has been selected on the basis of excellent wind conditions, proximity to transmission infrastructure and strong landholder participation. The project area spans multiple farming properties, all of which remain in productive agricultural use alongside the proposed development. Stage 1 is anticipated to comprise up to 300 MW of installed capacity, consisting of utility-scale wind turbines, associated access tracks, crane pads, underground electrical and communications cabling, collector substations, an operations and maintenance facility and grid-connection infrastructure. The wind farm is planned to connect to ElectraNet's 275 kV network. Development approvals for the wind farm have been secured in accordance with South Australia's Planning, Development and Infrastructure Act 2016. The project is also progressing detailed environmental management planning, including assessments undertaken in consultation with the Department for Environment and Water, the Department for Infrastructure and Transport, and specialist ecological and heritage advisors, covering native vegetation, avifauna and bat management, noise, visual considerations, cultural heritage management and construction-phase compliance requirements. Construction timeframes will be confirmed once contracting arrangements, grid-connection programs and final investment decision schedules are finalised. Subject to these milestones, construction is expected to span approximately 24-30 months, including mobilisation, civil and electrical works, turbine installation, commissioning and grid-compliance verification. Purpose Procurement for the Goyder North Wind Farm is expected to follow a structured process aligned with Neoen's global procurement framework. Neoen aims to maximise local content wherever practicable and expects its contractors to actively engage with local suppliers through transparent procurement processes. Scope The scope includes: Wind turbine supply Balance-of-plant civil and electrical works Substation and transmission connection works Operations and maintenance services Various professional, technical and logistical support roles Earthworks Concrete supply Steel fabrication Fencing Drainage Survey services Geotechnical services Electrical contracting Transport and cranage Accommodation Catering General construction support Contractor Requirements Compliance with Australian Standards relevant to electrical infrastructure, wind turbine assembly and high-voltage works ISO-aligned quality, environmental and safety management systems Demonstrated experience in large-scale civil or electrical construction Appropriate licences, certifications and insurances, including high-risk work licences, electrical worker registration, environmental management plans, and safety systems aligned with ISO 45001 Conformance with site-specific induction and training requirements For packages involving transportation of oversized components, adherence to the requirements of the Department for Infrastructure and Transport and local council road-use approvals How to Apply Next steps for suppliers include registering an EOI via the Gateway, ensuring all capability statements, company contacts and certifications are up to date. As the project moves toward procurement and delivery, shortlisted contractors will use the Gateway to access local supplier information and consider capable businesses for inclusion in tender lists. Further project updates, package releases and contracting opportunities will be communicated progressively as development, investment and grid-connection processes advance. Express interest for any opportunities that may arise for this project.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Submission deadline: 27 November 2026
Dust Suppression - Goyder Renewable Zone - Goyder North Wind Farm Project
- Submission deadline: 27 November 2026
Earthmoving and Construction Equipment Services - Goyder Renewable Zone - Goyder North Wind Farm Project
- Submission deadline: 27 November 2026
Assembly of Core Wind Turbine Components - Goyder Renewable Zone - Goyder North Wind Farm Project
- Submission deadline: 27 November 2026
Plant and Equipment Hire - Goyder Renewable Zone - Goyder North Wind Farm Project
- Submission deadline: 27 November 2026
Crane Hire - Goyder Renewable Zone - Goyder North Wind Farm Project
- Submission deadline: 04 December 2026
Growth Enabling NPI Program - Construction Delivery Capability - Copper SA Growth Enabling NPI Program: Construction Delivery Capability
