Altona Hockey Lighting
Tender Overview
About this tender
Overview Hobsons Bay City Council is seeking a contractor to carry out lighting works at the Altona Hockey Club. Scope The scope includes: Demolition and disposal of existing light poles, luminaires and other redundant infrastructure Construction of reinforced concrete footings Installation of 4 x 28m high new poles and LED luminaires for floodlighting the hockey field at Altona Hockey Club Contractor Requirements Pole arrangement and illumination levels must comply with Hockey Australia's Lighting for Hockey Fields guidelines Works must comply with relevant Australian Standards, including AS2560-2 (2021)
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 1 day24 November 2026, 02:00 PM Australia/Melbourne
Maribyrnong River Children’s Centre Internal Building Works
- Submission deadline: 25 November 2026
Predictor Upgrade at 175.340km Hamiton Hwy LXing Derrinallum
- Closes in 3 days26 November 2026, 02:00 PM Australia/Melbourne
Light up Buckingham
- Closes in 3 days26 November 2026, 04:00 PM Australia/Melbourne
Aintree North Electronic Scoreboard Project
- Submission deadline: 27 November 2026, 02:00 PM Australia/Melbourne
Dixon Field Pitch 1 LED lighting upgrade
- Submission deadline: 27 November 2026, 04:00 PM Australia/Melbourne
Construction of Yan Yean Pipe Track Shared Path (Bridge Inn Road to Hazel Glen Drive), Doreen
