Predictor Upgrade at 175.340km Hamiton Hwy LXing Derrinallum

Open for submissionsSubmission deadline: 25 November 2026

About this tender

Overview As part of its Annual Works Program, ARTC intends to upgrade the existing HXP3 predictor with an XP4 predictor at the Hamilton Hwy 175.340km level crossing at Derrinallum, and install a new Brodersen RTU32N unit level crossing monitor, replacing the existing RTU8 unit. The existing level crossing is a single-track crossing with flashing lights and boom gates and advance flashing road signs using an HXP3 predictor. Scope The Contractor shall act as Principal Contractor and provide a proposal for the design, construction, supply of all materials (excluding materials supplied by ARTC), installation, testing and commissioning required to upgrade the level crossing predictor. The scope includes, but is not necessarily limited to: Design, procurement, construction, installation, testing, commissioning and certification of signalling equipment in accordance with ARTC Standards and Guidelines Production of all appropriate design documentation in accordance with relevant ARTC standards, procedures and work instructions, with any contradiction within standards raised as an RFI to the ARTC Project Manager Supplying ARTC with appropriate Change Management documentation as detailed in Section 6, Change Management Equipment and materials supply (excluding materials supplied by ARTC), collection, distribution and preparation work for all materials Provision of IFC, As-Installed, As-Commissioned and As-Built drawings and documentation as required by ARTC Standards demonstrating that the work has been completed within the specified tolerances Certification of the work by the Commissioning Engineer prior to completion of the track occupancy period Rail safe working plans, controls and measures Protection of existing infrastructure, including cess drains, and prevention or clean-up of fouling from debris, spillages, or similar resulting from work activities Site clean-up and demobilisation Decommissioning, removal and disposal of redundant materials and equipment in accordance with state legislation Corrections to defective work attributed to the Contractor's workmanship Provision of plant and labour Provision of traffic management (if required) and related permits All other services required to deliver the works that have not been identified as supplied or provided by ARTC Predictor (Technical Scope) Upgrade the existing HXP3 predictor with an XP4 predictor at Hamilton Hwy 175.340km at Derrinallum Install a new Brodersen RTU32N unit level crossing monitor, replacing the existing RTU8 unit, at the same time as the new predictor is installed Remove the existing HXP3 predictor and install the new XP4 in the same equipment box, configured for two approach tracks plus the island track Design the level crossing layout in accordance with the latest ARTC standards and procedures and ensure the approach length has been calculated Use narrow band termination shunts on the approach tracks Contractor Requirements The works shall be undertaken in accordance with ARTC Standards, Australian Standards, Guidelines, Network Rules and Regulations, Policies and Procedures

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.