Bairnsdale Aerodrome Runway 04/22 Upgrade - Design and Construct

Closes in 2 daysSubmission deadline: 21 October 2026, 02:00 PM Australia/Melbourne

About this tender

Overview East Gippsland Shire Council requires the design and construction of Bairnsdale Aerodrome Runway 04/22 as a CASA Part 139 (Aerodromes) MOS-compliant Code 3 runway, safely accommodating the confirmed design aircraft and forecast operations. Scope The scope includes: Design and construction of Runway 04/22 to CASA Part 139 (Aerodromes) MOS-compliant Code 3 standard Provision of certified runway geometry, grading and drainage Pavement construction Installation of airfield ground lighting (AGL) Line marking Provision of a surface-friction system Works to safely accommodate the confirmed design aircraft and forecast operations, returning the aerodrome to operational service

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.