Broadford Hall Roof Replacement and Solar Project

Closes in 4 daysSubmission deadline: 06 November 2026, 04:00 PM Australia/Melbourne

About this tender

Overview Mitchell Shire Council is seeking a suitably qualified contractor to complete the replacement of the existing roof at Broadford Hall, including associated structural and compliance works, and the design, supply, installation and commissioning of a solar PV system. Scope The scope includes: Replacement of the existing roof at Broadford Hall Associated structural works Associated compliance works Installation of a safe roof access system Asbestos removal and cladding replacement works Design, supply, installation and commissioning of a solar PV system Any associated works required to facilitate the solar installation Instructions to Tenderers Tenderers may submit for: The complete project scope (Stage 1 and 2); or Stage 1, roof replacement works only; or Stage 2, solar PV installation works only Council reserves the right to appoint a single contractor for all works or separate contractors for individual components, depending on value, capability and project outcomes. Site Inspection A non-mandatory site visit will take place. Please register via the e-tender portal if you wish to attend.

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up