Supply and Delivery of Reinforced Concrete Pipe & Concrete Box Culverts

Advance notice — not yet open for submissionsExpected tender release: 23 October 2026 — indicative and subject to change

About this advance notice

Overview Goulburn-Murray Water (GMW) is seeking to establish a panel of suppliers to provide the supply and delivery of Reinforced Concrete Pipe and Concrete Box Culverts to work sites within the Goulburn-Murray Irrigation District. This is an advance notice only. No tender documents are currently available, and full details will be released with the tender. Purpose As part of its capital and asset maintenance program, GMW is required to build, repair, and maintain channels and assets across the Goulburn-Murray Irrigation District (GMID) for safety, property management, delivery of water to customers, and other agricultural and environmental reasons. Establishing this panel is intended to support a whole-business approach to this category. Scope The reinforced concrete pipe and concrete box culvert products to be included are as follows, but not limited to: Rubber Ring Joint, Bell-Socketed, Class 2, Reinforced Concrete Full Pipes (2.44m) Rubber Ring Joint, Bell-Socketed, Class 4, Reinforced Concrete Full Pipes (2.44m) Rubber Ring Joint, In-Wall, Class 2, Reinforced Concrete Full Pipes (2.44m) Rubber Ring Joint, In-Wall, Class 4, Reinforced Concrete Full Pipes (2.44m) uPVC Pipe Invert Units (with Lids) [W, H], standard length 2.4m Crown Units [W, H], standard length 2.4m, can be 1.2m Contract Terms and Conditions Proposed contract term of 3 years, with 2 x 1 year extension options Form of contract will be a VGPB Services/Goods Contract Instructions to Tenderers Goulburn-Murray Water intends to release this Request for Tender (RFT) in October/early November 2026. No documents are available at this stage; full details will be released with the tender. Enquiries Contact: Mikaela Thomas Email: mikaela.thomas@gmwater.com.au

How to prepare for this planned opportunity

This is an advance notice and is not yet open for submissions. Use the lead time to prepare without assuming the final request or deadline.

Review the advance notice

Read the buyer’s planned scope and note that the release estimate is indicative and may change.

Check your capacity

Consider delivery capacity, geographic coverage and likely partner requirements ahead of release.

Prepare capability material

Collect relevant project examples, outcomes and credentials that may support a future response.

Recheck when released

Wait for a verified opening, then review the published requirements and submission deadline before deciding to respond.

Prepare before this opportunity is released

Build your capability material now, then review the request when it opens.

Sign up