17900-L-70009 Provision of Pipe Fabrication (Supply and Fabrication) - Kwinana Gas Power Generation 2 Project
Tender Overview
About this tender
The scope of work comprises the supply of piping materials and fabrication of process piping systems for the Kwinana Swift Power Project Expansion (K2). The subcontractor shall provide all resources, materials, labour and services required for the procurement, fabrication, inspection, testing, coating, preservation and delivery of piping systems and associated components. This includes fabrication of process piping spools and firewater hydrant spools, together with full quality assurance and documentation deliverables. Specific scope requirements will be communicated to suitable Contractors via an Invitation to Tender. Specifications and Standards: All works shall be executed in accordance with: • Project Specifications • ASME B31.3 – Process Piping • ASME Section IX – Welding Qualification • ASME Section V – Inspection and NDT • Applicable Australian Standards (AS / AS/NZS) and project specifications • ISO 9001 Quality Management Systems • Relevant statutory and regulatory requirements The subcontractor shall ensure full compliance with all projects' technical, safety, quality and environmental requirements.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
