Concrete foundations and slab works (excluding turbine bases) Works - Narrogin Wind Farm
Tender Overview
About this tender
Overview Neoen Australia Pty. Ltd. is seeking a contractor for the Concrete foundations and slab works (excluding turbine bases) package at the Narrogin Wind Farm. The package covers the supply, delivery and construction of foundation and floor slab works for miscellaneous buildings and foundations associated with the electrical services work. Scope The scope includes: Detailed excavation for miscellaneous foundations and slabs Survey and as-built documentation Formwork Reinforcement Piling (auger) Concrete placement for miscellaneous foundations and slabs for electrical equipment, including transformers, lightning masts, cable pits, switchgear and substation structures A detailed Scope of Works and technical requirements will be provided upon invitation to tender. Enquiries All initial enquiries should be made through the Industry Capability Network Western Australia. Contact: Joelle Lim Email: Joelle.Lim@Icnwa.org.au Phone: +61 8 9365 7534
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
